AI Demos Research — the structured-intelligence platform. Every verdict on these pages opens to the execution behind it.
Graded 20 November 2026

Does RAGFlow reflect changes to existing content in its answers?

After an indexed document was edited and processed again, RAGFlow returned the new value and no longer returned the old one. Asked the same lead-time question before and after the change, it returned 11 working days before and 6 working days after, and a second full cycle repeated that result.

1 of 1 test case passed

Every test case in this scenario has a result.

Pass rate100%1 of 1 gradable
Coverage1 of 1test case with a result
1PassDid everything it was expected to do.
0FailNo test case failed.
0Not gradableEvery result here could be graded.
0UntestedEvery test case in this scenario has a result.
The pass rate is a summary. The evidence is the test case below: what we sent, what we checked, what the tool returned, and the proof.

The test case

Each test case is judged on its own: Pass, Fail, Not gradable, or Untested. The scenario result above is based on this test case.

Indexed value changed at the source, then queried after a refreshPassEvidence
What we sent

Input 1 · Before the file change: “What is the shipping lead time to the Bergen depot?”

The old document was deleted, the changed file was uploaded under the same name, and it was processed until done.

Input 2 · After the file change: “What is the shipping lead time to the Bergen depot?”

What the tool returned

Copied from Output file (text), lines 41–42, 166–167, 294–295

Textthe whole file · cited lines 41–42, 166–167 and 294–295 marked
TC99 evidence -- RAGFlow Cloud v0.26.4 (Starter) -- change a value in an indexed document, run the update path, ask for the fact
generated 2026-10-22T15:53:05+05:30

Mutation dataset: R6-mutation-MS (db501318cdfb11f1a062a9d444378041) -- separate from the stable dataset; embedding text-embedding-3-small@openai-r6@OpenAI#41c5adb6ca0411f19340d9e6bf179919; chunk_method naive
slice digests (recomputed): MS-v1 953bb6960d50a969 | MS-v2 a1de5a13d3f0d9a1    expected from spec: MS-v1 953bb6960d50a969 | MS-v2 a1de5a13d3f0d9a1
B02 at MS-v1: 163778 bytes, Bergen row 11 working days | B02 at MS-v2: 163766 bytes, Bergen row 6 working days | same filename

Retrieval: POST /retrieval {question, dataset_ids}, every other setting at default. Question: 'What is the shipping lead time to the Bergen depot?'
Update path: RAGFlow has no replace-file call. Used: DELETE the old document, POST the new file under the same filename, POST /chunks (parse), poll until run=DONE (cap 1200s, past which it would be recorded as non-convergence).

Where '11 working days' appears among the parsed chunks of the other MS documents (must be nowhere):
  B01_oncall_rota_notes.md: 1 chunks, '11 working days' = False
  B03_approved_supplier_list.docx: 2 chunks, '11 working days' = False
  B04_site_access_notes.txt: 1 chunks, '11 working days' = False
  B05_tromso_depot_bulletin.md: 1 chunks, '11 working days' = False

Probe (scratch dataset): upload B02 MS-v1, then B02 MS-v2 under the same name WITHOUT deleting -> [('B02_shipping_lead_times(1).pdf', 163766), ('B02_shipping_lead_times.pdf', 163778)] (the second upload is stored as a separate '(1)' copy, nothing is replaced)

====================================================================================================
RUN 1
====================================================================================================
reset to MS-v1: B02 (11 working days) uploaded and parsed -> run=DONE chunks=2 in 1182.9s

-- BEFORE the change (MS-v1): 6 chunks, 10.036s | Bergen lead time in returned chunks: ['11 working days'] | '11 working days' returned: True | '6 working days' returned: False

  [0] B02_shipping_lead_times.pdf  similarity=0.3335 vector=0.8005 term=0.1333
      
      Fenwake Instruments Ltd
      Shipping Lead Times
      Central storeBristol outbound todepots and customer its
      Howtoread this
      Lead times are quoted from the courier collection, not from the moment a stores request is raised.
      Anything handed over after the 15:30 cut-off travels the following working day, and the lead time starts then.
      Dangerous goods
      Any consignment containing a lithium cell above the threshold needs a signed packing declaration and travels on a different service. Add two working days to the figures above, and involve a trained shipper before booking. Two people in the building hold the certification.
      Returns
      Inbound lead times are not the outbound figures in reverse. A return from a depot travels on the next scheduled groupage movement rather than on collection, so plan a return around the movement rather than around the courier.
      Who maintains this
      The stores controller reviews these figures against the carrier's performance each quarter and changes them here when the carrier's own schedule changes.

  [1] B02_shipping_lead_times.pdf  similarity=0.3316 vector=0.8165 term=0.1238
      <table><caption> Lead times to theNordic depots as e a groupage service.A dedicated vehicle is quoted on request and is normally quicker,but is not held against these figures</caption><tr><td >Destination</td><td >Route</td><td >Lead time</td></tr><tr><td >Aberdeen</td><td >Road, own vehicle</td><td >3 working days</td></tr><tr><td >Lerwick</td><td >Road and ferry</td><td >4 working days</td></tr><tr><td >Gothenburg</td><td >Road and ferry, groupage</td><td >7 working days</td></tr><tr><td >Esbjerg</td><td >Road and ferry, groupage</td><td >9 working days</td></tr><tr><td >Bergen</td><td >Road and ferry, groupage</td><td >11 working days</td></tr></table>

  [2] B05_tromso_depot_bulletin.md  similarity=0.2720 vector=0.7734 term=0.0571
      # Depot bulletin - a new depot in the region
      For the service desk, the Bergen depot and central stores.
      ## What is opening
      The Tromso depot opens on 14 October 2026 and will hold four Tolvan C5 loan units and a full Brannoc spares kit. It is the third depot in the network and the first
      above the Arctic Circle.
      ## Why
      Response to the northern fields has been limited by the sailing time from
      Bergen rather than by engineering. Holding loan stock and a spares kit locally
      removes the leg that has cost the most time on recent tickets.
      ## Staffing
      One engineer and a shared stores controller, working 07:00 to 15:00 local time,
      Monday to Friday. Out of hours the northern sites continue to page the existing
      duty engineer rota; the new depot does not change how a fault is reported.
      ## What to do differently
      Stop routing northern loan requests through Bergen once the depot opens. Ring
      the new depot directly. Bergen keeps its own loan pool and its own spares kit,
      and nothing moves out of Bergen to stock the new site.
      ## What is not changing
      Calibration stays in the laboratory. The new depot does not calibrate, does not
      break a calibration seal, and does not open a pressure housing.
      
      

  [3] B03_approved_supplier_list.docx  similarity=0.2351 vector=0.6282 term=0.0667
      Approved Supplier ListFenwake Instruments Ltd - parts fitted to instruments in service1. ScopeThis list names the suppliers approved for parts fitted to instruments in service. A part from a supplier not on this list is not fitted, whatever the lead time pressure, because the part becomes part of a calibrated instrument.2. Single-source partsThe sole approved supplier of the H-clamp bracket is Ardwyn Fabrication (Newport), quoted per batch of fifty. The bracket is machined to our drawing and no second source has been qualified, so a shortage here stops the fitting rather than being worked around.Where a single-source part is short, the stores controller tells the service desk lead the same day. A substitution is authorised by the head of service operations in writing, and the instrument record carries the substitution.3. Approved suppliers4. Qualifying a new supplierA new supplier is qualified on a first-article inspection and a documented material certificate. Qualification is recorded against the part, not against the supplier as a whole: a supplier approved for one part is not thereby approved for another.5. ReviewThe stores controller reviews this list each quarter with the workshop manager. A supplier that has missed two consecutive delivery commitments is reviewed regardless of the schedule.

  [4] B01_oncall_rota_notes.md  similarity=0.2263 vector=0.6210 term=0.0571
      # On-call rota - working notes
      For the service desk lead. Not a contractual document.
      ## Shape of the rota
      The duty engineer rota runs Monday to Monday, handing over at 09:00. Four
      engineers are on the rota at any time, which puts each of them on call one week
      in four. An engineer who is on call does not travel offshore in the same week.
      ## Cover for absence
      Where an engineer on the rota is absent, the service desk lead swaps rather
      than doubles: the week is given to the next engineer in the cycle and the
      absent engineer takes theirs. Doubling a week has caused more missed pages than
      any other cause and is not done.
      
      On a statutory non-working day the rota does not change. The standby allowance
      for that week is paid at the enhanced rate set out in the handbook.
      ## Handover
      Handover is a call, not a message. The outgoing engineer walks the incoming one
      through every ticket still open, what has been tried, and what the customer has
      been told. A ticket that changes hands without that call is the single most
      common source of a customer being told two different things.
      ## Paging
      The out-of-hours number pages the engineer on call. Where the page is not
      acknowledged, it escalates to the service desk lead automatically, and then to
      the head of service operations. Test the pager at the start of every week
      before the handover call ends.
      
      

  [5] B04_site_access_notes.txt  similarity=0.2145 vector=0.6260 term=0.0381
      
      FENWAKE INSTRUMENTS LTD
      Site access - standing notes for engineers
      Central store and service desk. Not a contractual document.
      
      PERMITS
      
         Most customer sites need a permit raised before the day, not on it. Raise it
         through the customer's own system and take the reference with you; a permit
         that exists only in an inbox is a permit that will not open a gate.
      
         A permit is site-specific and person-specific. An engineer who swaps onto a
         job at short notice needs their own, and the swap is the reason most access
         is refused at the gate.
      
      INDUCTIONS
      
         Water treatment sites and harbour authorities run their own inductions,
         valid for twelve months. The service desk keeps the expiry dates against
         each engineer. An induction that expires mid-job is treated as expired for
         the whole job.
      
      TIDE AND ACCESS WINDOWS
      
         Intake structures are reachable only around low water. Plan the visit around
         the window and tell the customer which window you are working to, so that a
         delayed start is a conversation rather than a surprise.
      
      KEYS AND CODES
      
         Never write a gate code on a job sheet. Codes are held by the service desk
         and read out on the day. A code that has changed is reported the same day,
         because the next engineer will otherwise repeat the wasted journey.
      
      VESSELS
      
         On a vessel, the master's instructions take precedence. Board with your own
         survival certification in date; the vessel will check it and will refuse
         boarding without it.
      
      WHAT TO DO IF ACCESS IS REFUSED
      
         Do not argue at the gate. Ring the service desk, who will ring the
         customer's site contact. Record the refusal and the reason on the ticket
         before leaving, while the detail is still accurate.
      

-- CHANGE: delete old B02, upload MS-v2 B02 (same filename), parse -> run=DONE chunks=2 in 250.5s

-- AFTER the change (MS-v2): 6 chunks, 3.873s | Bergen lead time in returned chunks: ['6 working days'] | '11 working days' returned: False | '6 working days' returned: True | B02 documents in the dataset: ['B02_shipping_lead_times.pdf']

  [0] B02_shipping_lead_times.pdf  similarity=0.3335 vector=0.8005 term=0.1333
      
      Fenwake Instruments Ltd
      Shipping Lead Times
      Central storeBristol outbound todepots and customer its
      Howtoread this
      Lead times are quoted from the courier collection, not from the moment a stores request is raised.
      Anything handed over after the 15:30 cut-off travels the following working day, and the lead time starts then.
      Dangerous goods
      Any consignment containing a lithium cell above the threshold needs a signed packing declaration and travels on a different service. Add two working days to the figures above, and involve a trained shipper before booking. Two people in the building hold the certification.
      Returns
      Inbound lead times are not the outbound figures in reverse. A return from a depot travels on the next scheduled groupage movement rather than on collection, so plan a return around the movement rather than around the courier.
      Who maintains this
      The stores controller reviews these figures against the carrier's performance each quarter and changes them here when the carrier's own schedule changes.

  [1] B02_shipping_lead_times.pdf  similarity=0.3315 vector=0.8162 term=0.1238
      <table><caption> Lead times to theNordic depots as e a groupage service.A dedicated vehicle is quoted on request and is normally quicker,but is not held against these figures</caption><tr><td >Destination</td><td >Route</td><td >Lead time</td></tr><tr><td >Aberdeen</td><td >Road, own vehicle</td><td >3 working days</td></tr><tr><td >Lerwick</td><td >Road and ferry</td><td >4 working days</td></tr><tr><td >Gothenburg</td><td >Road and ferry, groupage</td><td >7 working days</td></tr><tr><td >Esbjerg</td><td >Road and ferry, groupage</td><td >9 working days</td></tr><tr><td >Bergen</td><td >Road and ferry, groupage</td><td >6 working days</td></tr></table>

  [2] B05_tromso_depot_bulletin.md  similarity=0.2720 vector=0.7734 term=0.0571
      # Depot bulletin - a new depot in the region
      For the service desk, the Bergen depot and central stores.
      ## What is opening
      The Tromso depot opens on 14 October 2026 and will hold four Tolvan C5 loan units and a full Brannoc spares kit. It is the third depot in the network and the first
      above the Arctic Circle.
      ## Why
      Response to the northern fields has been limited by the sailing time from
      Bergen rather than by engineering. Holding loan stock and a spares kit locally
      removes the leg that has cost the most time on recent tickets.
      ## Staffing
      One engineer and a shared stores controller, working 07:00 to 15:00 local time,
      Monday to Friday. Out of hours the northern sites continue to page the existing
      duty engineer rota; the new depot does not change how a fault is reported.
      ## What to do differently
      Stop routing northern loan requests through Bergen once the depot opens. Ring
      the new depot directly. Bergen keeps its own loan pool and its own spares kit,
      and nothing moves out of Bergen to stock the new site.
      ## What is not changing
      Calibration stays in the laboratory. The new depot does not calibrate, does not
      break a calibration seal, and does not open a pressure housing.
      
      

  [3] B03_approved_supplier_list.docx  similarity=0.2351 vector=0.6282 term=0.0667
      Approved Supplier ListFenwake Instruments Ltd - parts fitted to instruments in service1. ScopeThis list names the suppliers approved for parts fitted to instruments in service. A part from a supplier not on this list is not fitted, whatever the lead time pressure, because the part becomes part of a calibrated instrument.2. Single-source partsThe sole approved supplier of the H-clamp bracket is Ardwyn Fabrication (Newport), quoted per batch of fifty. The bracket is machined to our drawing and no second source has been qualified, so a shortage here stops the fitting rather than being worked around.Where a single-source part is short, the stores controller tells the service desk lead the same day. A substitution is authorised by the head of service operations in writing, and the instrument record carries the substitution.3. Approved suppliers4. Qualifying a new supplierA new supplier is qualified on a first-article inspection and a documented material certificate. Qualification is recorded against the part, not against the supplier as a whole: a supplier approved for one part is not thereby approved for another.5. ReviewThe stores controller reviews this list each quarter with the workshop manager. A supplier that has missed two consecutive delivery commitments is reviewed regardless of the schedule.

  [4] B01_oncall_rota_notes.md  similarity=0.2263 vector=0.6210 term=0.0571
      # On-call rota - working notes
      For the service desk lead. Not a contractual document.
      ## Shape of the rota
      The duty engineer rota runs Monday to Monday, handing over at 09:00. Four
      engineers are on the rota at any time, which puts each of them on call one week
      in four. An engineer who is on call does not travel offshore in the same week.
      ## Cover for absence
      Where an engineer on the rota is absent, the service desk lead swaps rather
      than doubles: the week is given to the next engineer in the cycle and the
      absent engineer takes theirs. Doubling a week has caused more missed pages than
      any other cause and is not done.
      
      On a statutory non-working day the rota does not change. The standby allowance
      for that week is paid at the enhanced rate set out in the handbook.
      ## Handover
      Handover is a call, not a message. The outgoing engineer walks the incoming one
      through every ticket still open, what has been tried, and what the customer has
      been told. A ticket that changes hands without that call is the single most
      common source of a customer being told two different things.
      ## Paging
      The out-of-hours number pages the engineer on call. Where the page is not
      acknowledged, it escalates to the service desk lead automatically, and then to
      the head of service operations. Test the pager at the start of every week
      before the handover call ends.
      
      

  [5] B04_site_access_notes.txt  similarity=0.2145 vector=0.6260 term=0.0381
      
      FENWAKE INSTRUMENTS LTD
      Site access - standing notes for engineers
      Central store and service desk. Not a contractual document.
      
      PERMITS
      
         Most customer sites need a permit raised before the day, not on it. Raise it
         through the customer's own system and take the reference with you; a permit
         that exists only in an inbox is a permit that will not open a gate.
      
         A permit is site-specific and person-specific. An engineer who swaps onto a
         job at short notice needs their own, and the swap is the reason most access
         is refused at the gate.
      
      INDUCTIONS
      
         Water treatment sites and harbour authorities run their own inductions,
         valid for twelve months. The service desk keeps the expiry dates against
         each engineer. An induction that expires mid-job is treated as expired for
         the whole job.
      
      TIDE AND ACCESS WINDOWS
      
         Intake structures are reachable only around low water. Plan the visit around
         the window and tell the customer which window you are working to, so that a
         delayed start is a conversation rather than a surprise.
      
      KEYS AND CODES
      
         Never write a gate code on a job sheet. Codes are held by the service desk
         and read out on the day. A code that has changed is reported the same day,
         because the next engineer will otherwise repeat the wasted journey.
      
      VESSELS
      
         On a vessel, the master's instructions take precedence. Board with your own
         survival certification in date; the vessel will check it and will refuse
         boarding without it.
      
      WHAT TO DO IF ACCESS IS REFUSED
      
         Do not argue at the gate. Ring the service desk, who will ring the
         customer's site contact. Record the refusal and the reason on the ticket
         before leaving, while the detail is still accurate.
      

====================================================================================================
RUN 2
====================================================================================================
reset to MS-v1: B02 (11 working days) uploaded and parsed -> run=DONE chunks=2 in 32.2s

-- BEFORE the change (MS-v1): 6 chunks, 2.176s | Bergen lead time in returned chunks: ['11 working days'] | '11 working days' returned: True | '6 working days' returned: False

  [0] B02_shipping_lead_times.pdf  similarity=0.3336 vector=0.8008 term=0.1333
      
      Fenwake Instruments Ltd
      Shipping Lead Times
      Central storeBristol outbound todepots and customer its
      Howtoread this
      Lead times are quoted from the courier collection, not from the moment a stores request is raised.
      Anything handed over after the 15:30 cut-off travels the following working day, and the lead time starts then.
      Dangerous goods
      Any consignment containing a lithium cell above the threshold needs a signed packing declaration and travels on a different service. Add two working days to the figures above, and involve a trained shipper before booking. Two people in the building hold the certification.
      Returns
      Inbound lead times are not the outbound figures in reverse. A return from a depot travels on the next scheduled groupage movement rather than on collection, so plan a return around the movement rather than around the courier.
      Who maintains this
      The stores controller reviews these figures against the carrier's performance each quarter and changes them here when the carrier's own schedule changes.

  [1] B02_shipping_lead_times.pdf  similarity=0.3317 vector=0.8168 term=0.1238
      <table><caption> Lead times to theNordic depots as e a groupage service.A dedicated vehicle is quoted on request and is normally quicker,but is not held against these figures</caption><tr><td >Destination</td><td >Route</td><td >Lead time</td></tr><tr><td >Aberdeen</td><td >Road, own vehicle</td><td >3 working days</td></tr><tr><td >Lerwick</td><td >Road and ferry</td><td >4 working days</td></tr><tr><td >Gothenburg</td><td >Road and ferry, groupage</td><td >7 working days</td></tr><tr><td >Esbjerg</td><td >Road and ferry, groupage</td><td >9 working days</td></tr><tr><td >Bergen</td><td >Road and ferry, groupage</td><td >11 working days</td></tr></table>

  [2] B05_tromso_depot_bulletin.md  similarity=0.2721 vector=0.7736 term=0.0571
      # Depot bulletin - a new depot in the region
      For the service desk, the Bergen depot and central stores.
      ## What is opening
      The Tromso depot opens on 14 October 2026 and will hold four Tolvan C5 loan units and a full Brannoc spares kit. It is the third depot in the network and the first
      above the Arctic Circle.
      ## Why
      Response to the northern fields has been limited by the sailing time from
      Bergen rather than by engineering. Holding loan stock and a spares kit locally
      removes the leg that has cost the most time on recent tickets.
      ## Staffing
      One engineer and a shared stores controller, working 07:00 to 15:00 local time,
      Monday to Friday. Out of hours the northern sites continue to page the existing
      duty engineer rota; the new depot does not change how a fault is reported.
      ## What to do differently
      Stop routing northern loan requests through Bergen once the depot opens. Ring
      the new depot directly. Bergen keeps its own loan pool and its own spares kit,
      and nothing moves out of Bergen to stock the new site.
      ## What is not changing
      Calibration stays in the laboratory. The new depot does not calibrate, does not
      break a calibration seal, and does not open a pressure housing.
      
      

  [3] B03_approved_supplier_list.docx  similarity=0.2351 vector=0.6282 term=0.0667
      Approved Supplier ListFenwake Instruments Ltd - parts fitted to instruments in service1. ScopeThis list names the suppliers approved for parts fitted to instruments in service. A part from a supplier not on this list is not fitted, whatever the lead time pressure, because the part becomes part of a calibrated instrument.2. Single-source partsThe sole approved supplier of the H-clamp bracket is Ardwyn Fabrication (Newport), quoted per batch of fifty. The bracket is machined to our drawing and no second source has been qualified, so a shortage here stops the fitting rather than being worked around.Where a single-source part is short, the stores controller tells the service desk lead the same day. A substitution is authorised by the head of service operations in writing, and the instrument record carries the substitution.3. Approved suppliers4. Qualifying a new supplierA new supplier is qualified on a first-article inspection and a documented material certificate. Qualification is recorded against the part, not against the supplier as a whole: a supplier approved for one part is not thereby approved for another.5. ReviewThe stores controller reviews this list each quarter with the workshop manager. A supplier that has missed two consecutive delivery commitments is reviewed regardless of the schedule.

  [4] B01_oncall_rota_notes.md  similarity=0.2263 vector=0.6211 term=0.0571
      # On-call rota - working notes
      For the service desk lead. Not a contractual document.
      ## Shape of the rota
      The duty engineer rota runs Monday to Monday, handing over at 09:00. Four
      engineers are on the rota at any time, which puts each of them on call one week
      in four. An engineer who is on call does not travel offshore in the same week.
      ## Cover for absence
      Where an engineer on the rota is absent, the service desk lead swaps rather
      than doubles: the week is given to the next engineer in the cycle and the
      absent engineer takes theirs. Doubling a week has caused more missed pages than
      any other cause and is not done.
      
      On a statutory non-working day the rota does not change. The standby allowance
      for that week is paid at the enhanced rate set out in the handbook.
      ## Handover
      Handover is a call, not a message. The outgoing engineer walks the incoming one
      through every ticket still open, what has been tried, and what the customer has
      been told. A ticket that changes hands without that call is the single most
      common source of a customer being told two different things.
      ## Paging
      The out-of-hours number pages the engineer on call. Where the page is not
      acknowledged, it escalates to the service desk lead automatically, and then to
      the head of service operations. Test the pager at the start of every week
      before the handover call ends.
      
      

  [5] B04_site_access_notes.txt  similarity=0.2145 vector=0.6261 term=0.0381
      
      FENWAKE INSTRUMENTS LTD
      Site access - standing notes for engineers
      Central store and service desk. Not a contractual document.
      
      PERMITS
      
         Most customer sites need a permit raised before the day, not on it. Raise it
         through the customer's own system and take the reference with you; a permit
         that exists only in an inbox is a permit that will not open a gate.
      
         A permit is site-specific and person-specific. An engineer who swaps onto a
         job at short notice needs their own, and the swap is the reason most access
         is refused at the gate.
      
      INDUCTIONS
      
         Water treatment sites and harbour authorities run their own inductions,
         valid for twelve months. The service desk keeps the expiry dates against
         each engineer. An induction that expires mid-job is treated as expired for
         the whole job.
      
      TIDE AND ACCESS WINDOWS
      
         Intake structures are reachable only around low water. Plan the visit around
         the window and tell the customer which window you are working to, so that a
         delayed start is a conversation rather than a surprise.
      
      KEYS AND CODES
      
         Never write a gate code on a job sheet. Codes are held by the service desk
         and read out on the day. A code that has changed is reported the same day,
         because the next engineer will otherwise repeat the wasted journey.
      
      VESSELS
      
         On a vessel, the master's instructions take precedence. Board with your own
         survival certification in date; the vessel will check it and will refuse
         boarding without it.
      
      WHAT TO DO IF ACCESS IS REFUSED
      
         Do not argue at the gate. Ring the service desk, who will ring the
         customer's site contact. Record the refusal and the reason on the ticket
         before leaving, while the detail is still accurate.
      

-- CHANGE: delete old B02, upload MS-v2 B02 (same filename), parse -> run=DONE chunks=2 in 37.5s

-- AFTER the change (MS-v2): 6 chunks, 3.538s | Bergen lead time in returned chunks: ['6 working days'] | '11 working days' returned: False | '6 working days' returned: True | B02 documents in the dataset: ['B02_shipping_lead_times.pdf']

  [0] B02_shipping_lead_times.pdf  similarity=0.3335 vector=0.8005 term=0.1333
      
      Fenwake Instruments Ltd
      Shipping Lead Times
      Central storeBristol outbound todepots and customer its
      Howtoread this
      Lead times are quoted from the courier collection, not from the moment a stores request is raised.
      Anything handed over after the 15:30 cut-off travels the following working day, and the lead time starts then.
      Dangerous goods
      Any consignment containing a lithium cell above the threshold needs a signed packing declaration and travels on a different service. Add two working days to the figures above, and involve a trained shipper before booking. Two people in the building hold the certification.
      Returns
      Inbound lead times are not the outbound figures in reverse. A return from a depot travels on the next scheduled groupage movement rather than on collection, so plan a return around the movement rather than around the courier.
      Who maintains this
      The stores controller reviews these figures against the carrier's performance each quarter and changes them here when the carrier's own schedule changes.

  [1] B02_shipping_lead_times.pdf  similarity=0.3315 vector=0.8162 term=0.1238
      <table><caption> Lead times to theNordic depots as e a groupage service.A dedicated vehicle is quoted on request and is normally quicker,but is not held against these figures</caption><tr><td >Destination</td><td >Route</td><td >Lead time</td></tr><tr><td >Aberdeen</td><td >Road, own vehicle</td><td >3 working days</td></tr><tr><td >Lerwick</td><td >Road and ferry</td><td >4 working days</td></tr><tr><td >Gothenburg</td><td >Road and ferry, groupage</td><td >7 working days</td></tr><tr><td >Esbjerg</td><td >Road and ferry, groupage</td><td >9 working days</td></tr><tr><td >Bergen</td><td >Road and ferry, groupage</td><td >6 working days</td></tr></table>

  [2] B05_tromso_depot_bulletin.md  similarity=0.2720 vector=0.7734 term=0.0571
      # Depot bulletin - a new depot in the region
      For the service desk, the Bergen depot and central stores.
      ## What is opening
      The Tromso depot opens on 14 October 2026 and will hold four Tolvan C5 loan units and a full Brannoc spares kit. It is the third depot in the network and the first
      above the Arctic Circle.
      ## Why
      Response to the northern fields has been limited by the sailing time from
      Bergen rather than by engineering. Holding loan stock and a spares kit locally
      removes the leg that has cost the most time on recent tickets.
      ## Staffing
      One engineer and a shared stores controller, working 07:00 to 15:00 local time,
      Monday to Friday. Out of hours the northern sites continue to page the existing
      duty engineer rota; the new depot does not change how a fault is reported.
      ## What to do differently
      Stop routing northern loan requests through Bergen once the depot opens. Ring
      the new depot directly. Bergen keeps its own loan pool and its own spares kit,
      and nothing moves out of Bergen to stock the new site.
      ## What is not changing
      Calibration stays in the laboratory. The new depot does not calibrate, does not
      break a calibration seal, and does not open a pressure housing.
      
      

  [3] B03_approved_supplier_list.docx  similarity=0.2351 vector=0.6282 term=0.0667
      Approved Supplier ListFenwake Instruments Ltd - parts fitted to instruments in service1. ScopeThis list names the suppliers approved for parts fitted to instruments in service. A part from a supplier not on this list is not fitted, whatever the lead time pressure, because the part becomes part of a calibrated instrument.2. Single-source partsThe sole approved supplier of the H-clamp bracket is Ardwyn Fabrication (Newport), quoted per batch of fifty. The bracket is machined to our drawing and no second source has been qualified, so a shortage here stops the fitting rather than being worked around.Where a single-source part is short, the stores controller tells the service desk lead the same day. A substitution is authorised by the head of service operations in writing, and the instrument record carries the substitution.3. Approved suppliers4. Qualifying a new supplierA new supplier is qualified on a first-article inspection and a documented material certificate. Qualification is recorded against the part, not against the supplier as a whole: a supplier approved for one part is not thereby approved for another.5. ReviewThe stores controller reviews this list each quarter with the workshop manager. A supplier that has missed two consecutive delivery commitments is reviewed regardless of the schedule.

  [4] B04_site_access_notes.txt  similarity=0.2145 vector=0.6260 term=0.0381
      
      FENWAKE INSTRUMENTS LTD
      Site access - standing notes for engineers
      Central store and service desk. Not a contractual document.
      
      PERMITS
      
         Most customer sites need a permit raised before the day, not on it. Raise it
         through the customer's own system and take the reference with you; a permit
         that exists only in an inbox is a permit that will not open a gate.
      
         A permit is site-specific and person-specific. An engineer who swaps onto a
         job at short notice needs their own, and the swap is the reason most access
         is refused at the gate.
      
      INDUCTIONS
      
         Water treatment sites and harbour authorities run their own inductions,
         valid for twelve months. The service desk keeps the expiry dates against
         each engineer. An induction that expires mid-job is treated as expired for
         the whole job.
      
      TIDE AND ACCESS WINDOWS
      
         Intake structures are reachable only around low water. Plan the visit around
         the window and tell the customer which window you are working to, so that a
         delayed start is a conversation rather than a surprise.
      
      KEYS AND CODES
      
         Never write a gate code on a job sheet. Codes are held by the service desk
         and read out on the day. A code that has changed is reported the same day,
         because the next engineer will otherwise repeat the wasted journey.
      
      VESSELS
      
         On a vessel, the master's instructions take precedence. Board with your own
         survival certification in date; the vessel will check it and will refuse
         boarding without it.
      
      WHAT TO DO IF ACCESS IS REFUSED
      
         Do not argue at the gate. Ring the service desk, who will ring the
         customer's site contact. Record the refusal and the reason on the ticket
         before leaving, while the detail is still accurate.
      

  [5] B01_oncall_rota_notes.md  similarity=0.2130 vector=0.6210 term=0.0381
      # On-call rota - working notes
      For the service desk lead. Not a contractual document.
      ## Shape of the rota
      The duty engineer rota runs Monday to Monday, handing over at 09:00. Four
      engineers are on the rota at any time, which puts each of them on call one week
      in four. An engineer who is on call does not travel offshore in the same week.
      ## Cover for absence
      Where an engineer on the rota is absent, the service desk lead swaps rather
      than doubles: the week is given to the next engineer in the cycle and the
      absent engineer takes theirs. Doubling a week has caused more missed pages than
      any other cause and is not done.
      
      On a statutory non-working day the rota does not change. The standby allowance
      for that week is paid at the enhanced rate set out in the handbook.
      ## Handover
      Handover is a call, not a message. The outgoing engineer walks the incoming one
      through every ticket still open, what has been tried, and what the customer has
      been told. A ticket that changes hands without that call is the single most
      common source of a customer being told two different things.
      ## Paging
      The out-of-hours number pages the engineer on call. Where the page is not
      acknowledged, it escalates to the service desk lead automatically, and then to
      the head of service operations. Test the pager at the start of every week
      before the handover call ends.
      
      

SUMMARY (refresh seconds, state, 6 returned, 11 returned): [(1, 250.45885229099076, 'DONE', True, False), (2, 37.45874970802106, 'DONE', True, False)]
Expected vs. Found
✓Expected: The new lead time, 6 working days, comes back and the old one, 11 working days, does not.Found: In both cycles, the returned table listed Bergen at 11 working days before the change and 6 working days after it; the old figure no longer came back.
Supporting proof
Proof 1Screenshot
Notebook screenshot: the question and the returned results before the file change
Open original ↗
Proof 2Screenshot
Notebook screenshot: deleting the old file, uploading the changed one and processing it
Open original ↗
Proof 3Screenshot
Notebook screenshot: the returned Bergen row at 6 working days after the change
Open original ↗
Why this result

It is a Pass because the edited value replaced the old one in what RAGFlow returned: after the changed file finished processing, the same question brought back 6 working days and not 11. Only one copy of the file remained, and the old figure was in no other document.

Also observed in this test case

Processing time varied widely. Processing the changed file took from 37.5 to 607.5 seconds across three runs, because the processing task waited in a queue before it started.

No way to replace a file. RAGFlow offers no call to replace a file: uploading the changed file under the same name stored it as a separate copy and left the original in place, so the update deleted the old file and uploaded the new one.

Tested by Vivek Tomar · evidence dated 22 October 2026

Configuration and setup

How this tool was set up for the run and what the test needed in place. Each row is a fact from the run's records; a fact the records do not hold is left out, not guessed.

Software that produced the output
RAGFlow
Build or version
v0.26.4
Plan or tier
Starter
Model
text-embedding-3-small
Surface
API
Set up before the run
An indexed lead-time document listed the Bergen depot at 11 working days; its changed version said 6. The update had to finish before the question was asked again, and the old figure had to appear in no other document.
Chunking method
naive
Retrieval settings
product defaults; only the question and the dataset were set
Tested
22 October 2026 · Vivek Tomar

How this scenario is graded

How we decide Pass, Fail and Not gradable. The same rules apply to every tool tested on this scenario.

How results are decided

Each test case gets one result per tool: Pass, Fail or Not gradable. A test case we haven't run yet shows Untested. There are no partial results.

The rules
  • Pass: the tool did everything the test expected, and nothing it said contradicts the correct answer.
  • Fail: at least one expected behaviour clearly didn't happen; the test case's result says which one and quotes the tool.
  • Not gradable: our evidence couldn't settle the outcome (for example a record we needed is missing). It is never counted as a fail, and the test case's result says what's missing.

Where this sits in the benchmark

This page is one cell of a larger study: one tool, one scenario. Only this benchmark's frame appears here.

LevelNameScope
BenchmarkManaged RAG →15 scenarios · 9 tools
CapabilityKnowledge Sync →
ScenarioExisting content is changed →
ToolRAGFlow →

History of this result

What has happened to this result since it was first published. Runs and grades are never overwritten: a retest or a re-grade publishes a new result and keeps the earlier one readable.

from the publication record
20 November 2026First publishedManaged RAG v1

Act on this result

Nothing filed here edits the run or the grade. A challenge opens a review, and a review can produce a new run or a re-grade — which becomes the current result and leaves this one in the history.

This matches what I see

You run the same kind of test against your own setup and get the same behaviour.

Agree →
This does not match

Yours behaves differently. Tell us what you got, with a screenshot if you have one.

Disagree →
Point out an issue

Something here is wrong — a reference value, a transcription, a grade.

Report an issue →
Request a retest

On a newer build, a larger dataset, or your own setup.

Request a retest →
We have fixed this

Tell us what changed and we schedule a rerun of the failing test case. The old result stays as history.

Vendor notice →
Filed against this evidenceNothing yet. Challenges, counter-evidence and fix notices appear here with their outcome, and stay on the page after they are resolved.
Cite this result
aidemos.com/benchmarks/managed-rag/results/ragflow/existing-content-is-changed · 1 pass · 0 fail · coverage 1/1 · graded 2026-11-20

The same record is available as structured data through the AI Demos MCP server, with the counts, the coverage and every per-test-case reason carried as fields.

Verify the proof files

These files support this result. Open a file to inspect the original evidence.

Output file (text) ↗text/plain; charset=utf-8 · 37 KB
Proof 1 · Screenshot ↗image/png · 196 KB
Proof 2 · Screenshot ↗image/png · 178 KB
Proof 3 · Screenshot ↗image/png · 326 KB
File fingerprints (SHA-256)

A fingerprint identifies the exact file used for this result.

Output file (text)71df23c1d7dc2561a7ceb93056ecf07da57edef0a9e4c60fd18306eb0dc72999
Proof 1 · Screenshot7e4c1783fbe9fb486b53ca6dd4e5a8854d9f43c22038f9cc8eb0cc916aacbb95
Proof 2 · Screenshotabfa8ccd3adc9ae2dfc9f6d704f86e6ecc949a3898e6d4d6401e0c4fbc470ad2
Proof 3 · Screenshot718d2aae8a2eef085b49dd3e6f73bfdd01c2f400295802be98831b15073b0d00