AI Demos Research — the structured-intelligence platform. Every verdict on these pages opens to the execution behind it.
Graded 22 October 2026

Does RAGFlow stop using source content after it is deleted?

RAGFlow stopped using the supplier list after it was deleted. It had previously answered the supplier question with a citation to that list; afterwards, it said the information was not found and gave no citations.

1 of 1 test case passed

Every test case in this scenario has a result.

Pass rate100%1 of 1 gradable
Coverage1 of 1test case with a result
1PassDid everything it was expected to do.
0FailNo test case failed.
0Not gradableEvery result here could be graded.
0UntestedEvery test case in this scenario has a result.
The pass rate is a summary. The evidence is the test case below: what we sent, what we checked, what the tool returned, and the proof.

The test case

Each test case is judged on its own: Pass, Fail, Not gradable, or Untested. The scenario result above is based on this test case.

Sole-source document deleted, then queried after a refreshPassEvidence
What we sent

Input · Before and after deleting the supplier list: “Who is the approved supplier of the H-clamp bracket?”

What the tool returned

Shown first: Response 2 (After deleting it), the result this test is graded on.

The answer you are looking for is not found in the dataset!

Transcribed from Proof 2 · Screenshot

Everything the tool returned, in order (2)
  1. Before deleting the supplier list

    The approved supplier of the H-clamp bracket is Ardwyn Fabrication, located in Newport [ID:1].

  2. After deleting it

    The result this test is graded on, printed above.

Output file (text)
Run log: repeated deletions, full retrieved passages and answers before and after
Text329 lines
TC100 evidence -- RAGFlow Cloud v0.26.4 (Starter) -- delete the sole-source document, run the update path, ask for the fact
generated 2026-10-22T17:02:28+05:30

Mutation dataset: R6-mutation-MS (db501318cdfb11f1a062a9d444378041); chat assistant R6-mutation-MS-chat (db86e1dace0b11f1a2105763ac76adf5) created with only name + dataset_ids: llm gpt-5.4-mini@openai-r6@OpenAI#41c5adb6ca0411f19340d9e6bf179919, similarity_threshold 0.1, top_n 6, rerank '', default prompt untouched; empty_response 'Sorry! No relevant content was found in the knowledge base!'
slice digests (recomputed): MS-v2 a1de5a13d3f0d9a1 | MS-v3 1ab5d7c559bbcca1    expected from spec: MS-v2 a1de5a13d3f0d9a1 | MS-v3 1ab5d7c559bbcca1
Files: MS-v3 = MS-v2 minus B03_approved_supplier_list.docx; every other file identical.

Question: 'Who is the approved supplier of the H-clamp bracket?' | retrieval: POST /retrieval {question, dataset_ids}, every other setting at default; chat: POST /chat/completions, stream false
Removal path: DELETE /datasets/{id}/documents with the document id (no separate refresh call exists for a delete).

Sole-source check -- 'Ardwyn' / 'H-clamp' in the parsed chunks of every document except B03 (must be nowhere):
  R6-mutation-MS / B01_oncall_rota_notes.md: 1 chunks, Ardwyn=False, H-clamp=False
  R6-mutation-MS / B02_shipping_lead_times.pdf: 2 chunks, Ardwyn=False, H-clamp=False
  R6-mutation-MS / B04_site_access_notes.txt: 1 chunks, Ardwyn=False, H-clamp=False
  R6-mutation-MS / B05_tromso_depot_bulletin.md: 1 chunks, Ardwyn=False, H-clamp=False
  R6-stable-SS-v1 / A01_field_service_policy_and_charges_uk.pdf: 8 chunks, Ardwyn=False, H-clamp=False
  R6-stable-SS-v1 / A03_calibration_certificate_scan.pdf: 2 chunks, Ardwyn=False, H-clamp=False
  R6-stable-SS-v1 / A04_employee_handbook.docx: 2 chunks, Ardwyn=False, H-clamp=False
  R6-stable-SS-v1 / A05_depot_and_commissioning_note.md: 2 chunks, Ardwyn=False, H-clamp=False
  R6-stable-SS-v1 / A06_nordic_service_addendum.docx: 3 chunks, Ardwyn=False, H-clamp=False
  R6-stable-SS-v1 / A08_warranty_terms_sales_pack.pdf: 1 chunks, Ardwyn=False, H-clamp=False
  R6-stable-SS-v1 / A09_warranty_statement_service_pack.pdf: 2 chunks, Ardwyn=False, H-clamp=False
  R6-stable-SS-v1 / A10_tolvan_a3_product_overview.md: 2 chunks, Ardwyn=False, H-clamp=False

====================================================================================================
RUN 1
====================================================================================================
reset to MS-v2: B03 uploaded and parsed -> run=DONE chunks=2 in 29.4s
state: ['B01_oncall_rota_notes.md', 'B02_shipping_lead_times.pdf', 'B03_approved_supplier_list.docx', 'B04_site_access_notes.txt', 'B05_tromso_depot_bulletin.md']

-- BEFORE the delete (MS-v2): retrieval 2 chunks, 16.686s | B03 returned: True | Ardwyn in a returned chunk: True

  [0] B03_approved_supplier_list.docx  similarity=0.5392 vector=0.8050 term=0.4253
      Approved Supplier ListFenwake Instruments Ltd - parts fitted to instruments in service1. ScopeThis list names the suppliers approved for parts fitted to instruments in service. A part from a supplier not on this list is not fitted, whatever the lead time pressure, because the part becomes part of a calibrated instrument.2. Single-source partsThe sole approved supplier of the H-clamp bracket is Ardwyn Fabrication (Newport), quoted per batch of fifty. The bracket is machined to our drawing and no second source has been qualified, so a shortage here stops the fitting rather than being worked around.Where a single-source part is short, the stores controller tells the service desk lead the same day. A substitution is authorised by the head of service operations in writing, and the instrument record carries the substitution.3. Approved suppliers4. Qualifying a new supplierA new supplier is qualified on a first-article inspection and a documented material certificate. Qualification is recorded against the part, not against the supplier as a whole: a supplier approved for one part is not thereby approved for another.5. ReviewThe stores controller reviews this list each quarter with the workshop manager. A supplier that has missed two consecutive delivery commitments is reviewed regardless of the schedule.

  [1] B03_approved_supplier_list.docx  similarity=0.4770 vector=0.7727 term=0.3503
      <table><tr><td>Part</td><td>Supplier</td><td>Location</td></tr><tr><td>H-clamp bracket</td><td>Ardwyn Fabrication</td><td>Newport</td></tr><tr><td>Sacrificial anode set</td><td>Trellech Metals</td><td>Chepstow</td></tr><tr><td>Anti-fouling guard</td><td>Coldbrook Polymers</td><td>Taunton</td></tr><tr><td>Cable gland kit</td><td>Sedgemoor Sealing</td><td>Bridgwater</td></tr><tr><td>Armoured deck cable</td><td>Nailsea Cable Works</td><td>Nailsea</td></tr></table>

  chat answer (12.037s):
      The approved supplier of the H-clamp bracket is Ardwyn Fabrication (Newport) [ID:0] [ID:1].
  documents cited: ['B03_approved_supplier_list.docx'] | passages retrieved by the chat: ['B03_approved_supplier_list.docx', 'B03_approved_supplier_list.docx']

  passage [ID:0] B03_approved_supplier_list.docx similarity=0.5392
      Approved Supplier ListFenwake Instruments Ltd - parts fitted to instruments in service1. ScopeThis list names the suppliers approved for parts fitted to instruments in service. A part from a supplier not on this list is not fitted, whatever the lead time pressure, because the part becomes part of a calibrated instrument.2. Single-source partsThe sole approved supplier of the H-clamp bracket is Ardwyn Fabrication (Newport), quoted per batch of fifty. The bracket is machined to our drawing and no second source has been qualified, so a shortage here stops the fitting rather than being worked around.Where a single-source part is short, the stores controller tells the service desk lead the same day. A substitution is authorised by the head of service operations in writing, and the instrument record carries the substitution.3. Approved suppliers4. Qualifying a new supplierA new supplier is qualified on a first-article inspection and a documented material certificate. Qualification is recorded against the part, not against the supplier as a whole: a supplier approved for one part is not thereby approved for another.5. ReviewThe stores controller reviews this list each quarter with the workshop manager. A supplier that has missed two consecutive delivery commitments is reviewed regardless of the schedule.

  passage [ID:1] B03_approved_supplier_list.docx similarity=0.4770
      <table><tr><td>Part</td><td>Supplier</td><td>Location</td></tr><tr><td>H-clamp bracket</td><td>Ardwyn Fabrication</td><td>Newport</td></tr><tr><td>Sacrificial anode set</td><td>Trellech Metals</td><td>Chepstow</td></tr><tr><td>Anti-fouling guard</td><td>Coldbrook Polymers</td><td>Taunton</td></tr><tr><td>Cable gland kit</td><td>Sedgemoor Sealing</td><td>Bridgwater</td></tr><tr><td>Armoured deck cable</td><td>Nailsea Cable Works</td><td>Nailsea</td></tr></table>
  'Ardwyn' in the answer: True

-- DELETE B03_approved_supplier_list.docx: 18.3s | documents left: ['B01_oncall_rota_notes.md', 'B02_shipping_lead_times.pdf', 'B04_site_access_notes.txt', 'B05_tromso_depot_bulletin.md']

-- AFTER the delete (MS-v3): retrieval 0 chunks, 17.076s | B03 returned: False | Ardwyn in a returned chunk: False

  chat answer (4.592s):
      The answer you are looking for is not found in the dataset!
  documents cited: [] | passages retrieved by the chat: ['B04_site_access_notes.txt', 'B02_shipping_lead_times.pdf', 'B05_tromso_depot_bulletin.md', 'B02_shipping_lead_times.pdf', 'B01_oncall_rota_notes.md']

  passage [ID:0] B04_site_access_notes.txt similarity=0.1867
      
      FENWAKE INSTRUMENTS LTD
      Site access - standing notes for engineers
      Central store and service desk. Not a contractual document.
      
      PERMITS
      
         Most customer sites need a permit raised before the day, not on it. Raise it
         through the customer's own system and take the reference with you; a permit
         that exists only in an inbox is a permit that will not open a gate.
      
         A permit is site-specific and person-specific. An engineer who swaps onto a
         job at short notice needs their own, and the swap is the reason most access
         is refused at the gate.
      
      INDUCTIONS
      
         Water treatment sites and harbour authorities run their own inductions,
         valid for twelve months. The service desk keeps the expiry dates against
         each engineer. An induction that expires mid-job is treated as expired for
         the whole job.
      
      TIDE AND ACCESS WINDOWS
      
         Intake structures are reachable only around low water. Plan the visit around
         the window and tell the customer which window you are working to, so that a
         delayed start is a conversation rather than a surprise.
      
      KEYS AND CODES
      
         Never write a gate code on a job sheet. Codes are held by the service desk
         and read out on the day. A code that has changed is reported the same day,
         because the next engineer will otherwise repeat the wasted journey.
      
      VESSELS
      
         On a vessel, the master's instructions take precedence. Board with your own
         survival certification in date; the vessel will check it and will refuse
         boarding without it.
      
      WHAT TO DO IF ACCESS IS REFUSED
      
         Do not argue at the gate. Ring the service desk, who will ring the
         customer's site contact. Record the refusal and the reason on the ticket
         before leaving, while the detail is still accurate.
      

  passage [ID:1] B02_shipping_lead_times.pdf similarity=0.1844
      
      Fenwake Instruments Ltd
      Shipping Lead Times
      Central storeBristol outbound todepots and customer its
      Howtoread this
      Lead times are quoted from the courier collection, not from the moment a stores request is raised.
      Anything handed over after the 15:30 cut-off travels the following working day, and the lead time starts then.
      Dangerous goods
      Any consignment containing a lithium cell above the threshold needs a signed packing declaration and travels on a different service. Add two working days to the figures above, and involve a trained shipper before booking. Two people in the building hold the certification.
      Returns
      Inbound lead times are not the outbound figures in reverse. A return from a depot travels on the next scheduled groupage movement rather than on collection, so plan a return around the movement rather than around the courier.
      Who maintains this
      The stores controller reviews these figures against the carrier's performance each quarter and changes them here when the carrier's own schedule changes.

  passage [ID:2] B05_tromso_depot_bulletin.md similarity=0.1836
      # Depot bulletin - a new depot in the region
      For the service desk, the Bergen depot and central stores.
      ## What is opening
      The Tromso depot opens on 14 October 2026 and will hold four Tolvan C5 loan units and a full Brannoc spares kit. It is the third depot in the network and the first
      above the Arctic Circle.
      ## Why
      Response to the northern fields has been limited by the sailing time from
      Bergen rather than by engineering. Holding loan stock and a spares kit locally
      removes the leg that has cost the most time on recent tickets.
      ## Staffing
      One engineer and a shared stores controller, working 07:00 to 15:00 local time,
      Monday to Friday. Out of hours the northern sites continue to page the existing
      duty engineer rota; the new depot does not change how a fault is reported.
      ## What to do differently
      Stop routing northern loan requests through Bergen once the depot opens. Ring
      the new depot directly. Bergen keeps its own loan pool and its own spares kit,
      and nothing moves out of Bergen to stock the new site.
      ## What is not changing
      Calibration stays in the laboratory. The new depot does not calibrate, does not
      break a calibration seal, and does not open a pressure housing.
      
      

  passage [ID:3] B02_shipping_lead_times.pdf similarity=0.1818
      <table><caption> Lead times to theNordic depots as e a groupage service.A dedicated vehicle is quoted on request and is normally quicker,but is not held against these figures</caption><tr><td >Destination</td><td >Route</td><td >Lead time</td></tr><tr><td >Aberdeen</td><td >Road, own vehicle</td><td >3 working days</td></tr><tr><td >Lerwick</td><td >Road and ferry</td><td >4 working days</td></tr><tr><td >Gothenburg</td><td >Road and ferry, groupage</td><td >7 working days</td></tr><tr><td >Esbjerg</td><td >Road and ferry, groupage</td><td >9 working days</td></tr><tr><td >Bergen</td><td >Road and ferry, groupage</td><td >6 working days</td></tr></table>

  passage [ID:4] B01_oncall_rota_notes.md similarity=0.1763
      # On-call rota - working notes
      For the service desk lead. Not a contractual document.
      ## Shape of the rota
      The duty engineer rota runs Monday to Monday, handing over at 09:00. Four
      engineers are on the rota at any time, which puts each of them on call one week
      in four. An engineer who is on call does not travel offshore in the same week.
      ## Cover for absence
      Where an engineer on the rota is absent, the service desk lead swaps rather
      than doubles: the week is given to the next engineer in the cycle and the
      absent engineer takes theirs. Doubling a week has caused more missed pages than
      any other cause and is not done.
      
      On a statutory non-working day the rota does not change. The standby allowance
      for that week is paid at the enhanced rate set out in the handbook.
      ## Handover
      Handover is a call, not a message. The outgoing engineer walks the incoming one
      through every ticket still open, what has been tried, and what the customer has
      been told. A ticket that changes hands without that call is the single most
      common source of a customer being told two different things.
      ## Paging
      The out-of-hours number pages the engineer on call. Where the page is not
      acknowledged, it escalates to the service desk lead automatically, and then to
      the head of service operations. Test the pager at the start of every week
      before the handover call ends.
      
      
  B03 in the chat's passages: False | B03 cited: False | Ardwyn anywhere in passages or answer: False | answer conveys it has nothing: True

====================================================================================================
RUN 2
====================================================================================================
reset to MS-v2: B03 uploaded and parsed -> run=DONE chunks=2 in 23.6s
state: ['B01_oncall_rota_notes.md', 'B02_shipping_lead_times.pdf', 'B03_approved_supplier_list.docx', 'B04_site_access_notes.txt', 'B05_tromso_depot_bulletin.md']

-- BEFORE the delete (MS-v2): retrieval 2 chunks, 14.002s | B03 returned: True | Ardwyn in a returned chunk: True

  [0] B03_approved_supplier_list.docx  similarity=0.5392 vector=0.8049 term=0.4253
      Approved Supplier ListFenwake Instruments Ltd - parts fitted to instruments in service1. ScopeThis list names the suppliers approved for parts fitted to instruments in service. A part from a supplier not on this list is not fitted, whatever the lead time pressure, because the part becomes part of a calibrated instrument.2. Single-source partsThe sole approved supplier of the H-clamp bracket is Ardwyn Fabrication (Newport), quoted per batch of fifty. The bracket is machined to our drawing and no second source has been qualified, so a shortage here stops the fitting rather than being worked around.Where a single-source part is short, the stores controller tells the service desk lead the same day. A substitution is authorised by the head of service operations in writing, and the instrument record carries the substitution.3. Approved suppliers4. Qualifying a new supplierA new supplier is qualified on a first-article inspection and a documented material certificate. Qualification is recorded against the part, not against the supplier as a whole: a supplier approved for one part is not thereby approved for another.5. ReviewThe stores controller reviews this list each quarter with the workshop manager. A supplier that has missed two consecutive delivery commitments is reviewed regardless of the schedule.

  [1] B03_approved_supplier_list.docx  similarity=0.4770 vector=0.7727 term=0.3503
      <table><tr><td>Part</td><td>Supplier</td><td>Location</td></tr><tr><td>H-clamp bracket</td><td>Ardwyn Fabrication</td><td>Newport</td></tr><tr><td>Sacrificial anode set</td><td>Trellech Metals</td><td>Chepstow</td></tr><tr><td>Anti-fouling guard</td><td>Coldbrook Polymers</td><td>Taunton</td></tr><tr><td>Cable gland kit</td><td>Sedgemoor Sealing</td><td>Bridgwater</td></tr><tr><td>Armoured deck cable</td><td>Nailsea Cable Works</td><td>Nailsea</td></tr></table>

  chat answer (3.629s):
      The approved supplier of the H-clamp bracket is Ardwyn Fabrication, located in Newport [ID:1].
  documents cited: ['B03_approved_supplier_list.docx'] | passages retrieved by the chat: ['B03_approved_supplier_list.docx', 'B03_approved_supplier_list.docx']

  passage [ID:0] B03_approved_supplier_list.docx similarity=0.5392
      Approved Supplier ListFenwake Instruments Ltd - parts fitted to instruments in service1. ScopeThis list names the suppliers approved for parts fitted to instruments in service. A part from a supplier not on this list is not fitted, whatever the lead time pressure, because the part becomes part of a calibrated instrument.2. Single-source partsThe sole approved supplier of the H-clamp bracket is Ardwyn Fabrication (Newport), quoted per batch of fifty. The bracket is machined to our drawing and no second source has been qualified, so a shortage here stops the fitting rather than being worked around.Where a single-source part is short, the stores controller tells the service desk lead the same day. A substitution is authorised by the head of service operations in writing, and the instrument record carries the substitution.3. Approved suppliers4. Qualifying a new supplierA new supplier is qualified on a first-article inspection and a documented material certificate. Qualification is recorded against the part, not against the supplier as a whole: a supplier approved for one part is not thereby approved for another.5. ReviewThe stores controller reviews this list each quarter with the workshop manager. A supplier that has missed two consecutive delivery commitments is reviewed regardless of the schedule.

  passage [ID:1] B03_approved_supplier_list.docx similarity=0.4770
      <table><tr><td>Part</td><td>Supplier</td><td>Location</td></tr><tr><td>H-clamp bracket</td><td>Ardwyn Fabrication</td><td>Newport</td></tr><tr><td>Sacrificial anode set</td><td>Trellech Metals</td><td>Chepstow</td></tr><tr><td>Anti-fouling guard</td><td>Coldbrook Polymers</td><td>Taunton</td></tr><tr><td>Cable gland kit</td><td>Sedgemoor Sealing</td><td>Bridgwater</td></tr><tr><td>Armoured deck cable</td><td>Nailsea Cable Works</td><td>Nailsea</td></tr></table>
  'Ardwyn' in the answer: True

-- DELETE B03_approved_supplier_list.docx: 4.1s | documents left: ['B01_oncall_rota_notes.md', 'B02_shipping_lead_times.pdf', 'B04_site_access_notes.txt', 'B05_tromso_depot_bulletin.md']

-- AFTER the delete (MS-v3): retrieval 0 chunks, 1.481s | B03 returned: False | Ardwyn in a returned chunk: False

  chat answer (3.780s):
      The answer you are looking for is not found in the dataset!
  documents cited: [] | passages retrieved by the chat: ['B04_site_access_notes.txt', 'B02_shipping_lead_times.pdf', 'B05_tromso_depot_bulletin.md', 'B02_shipping_lead_times.pdf', 'B01_oncall_rota_notes.md']

  passage [ID:0] B04_site_access_notes.txt similarity=0.1867
      
      FENWAKE INSTRUMENTS LTD
      Site access - standing notes for engineers
      Central store and service desk. Not a contractual document.
      
      PERMITS
      
         Most customer sites need a permit raised before the day, not on it. Raise it
         through the customer's own system and take the reference with you; a permit
         that exists only in an inbox is a permit that will not open a gate.
      
         A permit is site-specific and person-specific. An engineer who swaps onto a
         job at short notice needs their own, and the swap is the reason most access
         is refused at the gate.
      
      INDUCTIONS
      
         Water treatment sites and harbour authorities run their own inductions,
         valid for twelve months. The service desk keeps the expiry dates against
         each engineer. An induction that expires mid-job is treated as expired for
         the whole job.
      
      TIDE AND ACCESS WINDOWS
      
         Intake structures are reachable only around low water. Plan the visit around
         the window and tell the customer which window you are working to, so that a
         delayed start is a conversation rather than a surprise.
      
      KEYS AND CODES
      
         Never write a gate code on a job sheet. Codes are held by the service desk
         and read out on the day. A code that has changed is reported the same day,
         because the next engineer will otherwise repeat the wasted journey.
      
      VESSELS
      
         On a vessel, the master's instructions take precedence. Board with your own
         survival certification in date; the vessel will check it and will refuse
         boarding without it.
      
      WHAT TO DO IF ACCESS IS REFUSED
      
         Do not argue at the gate. Ring the service desk, who will ring the
         customer's site contact. Record the refusal and the reason on the ticket
         before leaving, while the detail is still accurate.
      

  passage [ID:1] B02_shipping_lead_times.pdf similarity=0.1844
      
      Fenwake Instruments Ltd
      Shipping Lead Times
      Central storeBristol outbound todepots and customer its
      Howtoread this
      Lead times are quoted from the courier collection, not from the moment a stores request is raised.
      Anything handed over after the 15:30 cut-off travels the following working day, and the lead time starts then.
      Dangerous goods
      Any consignment containing a lithium cell above the threshold needs a signed packing declaration and travels on a different service. Add two working days to the figures above, and involve a trained shipper before booking. Two people in the building hold the certification.
      Returns
      Inbound lead times are not the outbound figures in reverse. A return from a depot travels on the next scheduled groupage movement rather than on collection, so plan a return around the movement rather than around the courier.
      Who maintains this
      The stores controller reviews these figures against the carrier's performance each quarter and changes them here when the carrier's own schedule changes.

  passage [ID:2] B05_tromso_depot_bulletin.md similarity=0.1836
      # Depot bulletin - a new depot in the region
      For the service desk, the Bergen depot and central stores.
      ## What is opening
      The Tromso depot opens on 14 October 2026 and will hold four Tolvan C5 loan units and a full Brannoc spares kit. It is the third depot in the network and the first
      above the Arctic Circle.
      ## Why
      Response to the northern fields has been limited by the sailing time from
      Bergen rather than by engineering. Holding loan stock and a spares kit locally
      removes the leg that has cost the most time on recent tickets.
      ## Staffing
      One engineer and a shared stores controller, working 07:00 to 15:00 local time,
      Monday to Friday. Out of hours the northern sites continue to page the existing
      duty engineer rota; the new depot does not change how a fault is reported.
      ## What to do differently
      Stop routing northern loan requests through Bergen once the depot opens. Ring
      the new depot directly. Bergen keeps its own loan pool and its own spares kit,
      and nothing moves out of Bergen to stock the new site.
      ## What is not changing
      Calibration stays in the laboratory. The new depot does not calibrate, does not
      break a calibration seal, and does not open a pressure housing.
      
      

  passage [ID:3] B02_shipping_lead_times.pdf similarity=0.1818
      <table><caption> Lead times to theNordic depots as e a groupage service.A dedicated vehicle is quoted on request and is normally quicker,but is not held against these figures</caption><tr><td >Destination</td><td >Route</td><td >Lead time</td></tr><tr><td >Aberdeen</td><td >Road, own vehicle</td><td >3 working days</td></tr><tr><td >Lerwick</td><td >Road and ferry</td><td >4 working days</td></tr><tr><td >Gothenburg</td><td >Road and ferry, groupage</td><td >7 working days</td></tr><tr><td >Esbjerg</td><td >Road and ferry, groupage</td><td >9 working days</td></tr><tr><td >Bergen</td><td >Road and ferry, groupage</td><td >6 working days</td></tr></table>

  passage [ID:4] B01_oncall_rota_notes.md similarity=0.1763
      # On-call rota - working notes
      For the service desk lead. Not a contractual document.
      ## Shape of the rota
      The duty engineer rota runs Monday to Monday, handing over at 09:00. Four
      engineers are on the rota at any time, which puts each of them on call one week
      in four. An engineer who is on call does not travel offshore in the same week.
      ## Cover for absence
      Where an engineer on the rota is absent, the service desk lead swaps rather
      than doubles: the week is given to the next engineer in the cycle and the
      absent engineer takes theirs. Doubling a week has caused more missed pages than
      any other cause and is not done.
      
      On a statutory non-working day the rota does not change. The standby allowance
      for that week is paid at the enhanced rate set out in the handbook.
      ## Handover
      Handover is a call, not a message. The outgoing engineer walks the incoming one
      through every ticket still open, what has been tried, and what the customer has
      been told. A ticket that changes hands without that call is the single most
      common source of a customer being told two different things.
      ## Paging
      The out-of-hours number pages the engineer on call. Where the page is not
      acknowledged, it escalates to the service desk lead automatically, and then to
      the head of service operations. Test the pager at the start of every week
      before the handover call ends.
      
      
  B03 in the chat's passages: False | B03 cited: False | Ardwyn anywhere in passages or answer: False | answer conveys it has nothing: True

SUMMARY (run, B03 before, cited before, B03 in retrieval after, B03 in chat passages after, Ardwyn after, says nothing): [(1, True, ['B03_approved_supplier_list.docx'], False, False, False, True), (2, True, ['B03_approved_supplier_list.docx'], False, False, False, True)]
Open the text file ↗
Expected vs. Found
✓Expected: Exclude the deleted document from results and citations, and say there is no information to answer the question.Found: The retrieval call returned 0 passages after deletion; the deleted list was absent from chat passages and citations, and the answer said the information was not found.
Supporting proof
Proof 1Screenshot
Notebook screenshot: the supplier answer and cited list before deletion
Open original ↗
Proof 2Screenshot
Notebook screenshot: no retrieval matches and a not-found reply after deletion
Open original ↗
Proof 3Screenshot
Notebook screenshot: deleting the supplier list and the documents left afterwards
Open original ↗
Why this result

The list was the sole source. After deletion, the retrieval call returned 0 passages; the chat retrieved five from other documents, none from that list, and said the information was not found, with no citations. This shows the deletion took effect, not a broken index.

Also observed in this test case

Variable query and deletion times. Queries about the approved supplier took 1.5–17.1 seconds. Deleting the supplier list took 4.1, 11.7 and 18.3 seconds.

Tested by Vivek Tomar · evidence dated 22 October 2026

Configuration and setup

How this tool was set up for the run and what the test needed in place. Each row is a fact from the run's records; a fact the records do not hold is left out, not guessed.

Software that produced the output
RAGFlow
Build or version
v0.26.4
Plan or tier
Starter
Model
gpt-5.4-mini
Surface
API
Set up before the run
The already-indexed supplier list had to be the sole source for the H-clamp bracket's approved supplier. The same question was asked before and after deleting the list through the document-removal API.
Similarity threshold
0.1
Response streaming
off
Tested
22 October 2026 · Vivek Tomar

How this scenario is graded

How we decide Pass, Fail and Not gradable. The same rules apply to every tool tested on this scenario.

How results are decided

Each test case gets one result per tool: Pass, Fail or Not gradable. A test case we haven't run yet shows Untested. There are no partial results.

The rules
  • Pass: the tool did everything the test expected, and nothing it said contradicts the correct answer.
  • Fail: at least one expected behaviour clearly didn't happen; the test case's result says which one and quotes the tool.
  • Not gradable: our evidence couldn't settle the outcome (for example a record we needed is missing). It is never counted as a fail, and the test case's result says what's missing.

Where this sits in the benchmark

This page is one cell of a larger study: one tool, one scenario. Only this benchmark's frame appears here.

LevelNameScope
BenchmarkManaged RAG →15 scenarios · 9 tools
CapabilityKnowledge Sync →
ScenarioContent is removed from the source →
ToolRAGFlow →

History of this result

What has happened to this result since it was first published. Runs and grades are never overwritten: a retest or a re-grade publishes a new result and keeps the earlier one readable.

from the publication record
13 November 2026First publishedManaged RAG v1

Act on this result

Nothing filed here edits the run or the grade. A challenge opens a review, and a review can produce a new run or a re-grade — which becomes the current result and leaves this one in the history.

This matches what I see

You run the same kind of test against your own setup and get the same behaviour.

Agree →
This does not match

Yours behaves differently. Tell us what you got, with a screenshot if you have one.

Disagree →
Point out an issue

Something here is wrong — a reference value, a transcription, a grade.

Report an issue →
Request a retest

On a newer build, a larger dataset, or your own setup.

Request a retest →
We have fixed this

Tell us what changed and we schedule a rerun of the failing test case. The old result stays as history.

Vendor notice →
Filed against this evidenceNothing yet. Challenges, counter-evidence and fix notices appear here with their outcome, and stay on the page after they are resolved.
Cite this result
aidemos.com/benchmarks/managed-rag/results/ragflow/content-is-removed-from-the-source · 1 pass · 0 fail · coverage 1/1 · graded 2026-10-22

The same record is available as structured data through the AI Demos MCP server, with the counts, the coverage and every per-test-case reason carried as fields.

Verify the proof files

These files support this result. Open a file to inspect the original evidence.

Proof 1 · Screenshot ↗image/png · 180 KB
Proof 2 · Screenshot ↗image/png · 180 KB
Proof 3 · Screenshot ↗image/png · 93 KB
Output file (text) ↗text/plain; charset=utf-8 · 27 KB
File fingerprints (SHA-256)

A fingerprint identifies the exact file used for this result.

Proof 1 · Screenshot59b96fec4b382af8d46ac33fe686b0c83bf76f249e589730711e75197791adfc
Proof 2 · Screenshotca3ae88cfdf9842254bbc5a04961b0a5c2cd849dc9ba19307ab2c7821dd36985
Proof 3 · Screenshot8be5f8f8b15d9f598c675944f675563b3a8e57ee34cb6248ad50395477146b76
Output file (text)d02f0e2aa2ee0af837433739d314e6819480944cee9f127f399fcea8ede13637