AI Demos Research — the structured-intelligence platform. Every verdict on these pages opens to the execution behind it.
Graded 9 November 2026

Does RAGFlow keep retrieval within the developer's chosen document subset?

RAGFlow respected the document restriction, returning three Nordic service passages without the depot note that held the answer. The depot note ranked first in both the unrestricted search and the UK-only comparison search.

1 of 1 test case passed

Every test case in this scenario has a result.

Pass rate100%1 of 1 gradable
Coverage1 of 1test case with a result
1PassDid everything it was expected to do.
0FailNo test case failed.
0Not gradableEvery result here could be graded.
0UntestedEvery test case in this scenario has a result.
The pass rate is a summary. The evidence is the test case below: what we sent, what we checked, what the tool returned, and the proof.

The test case

Each test case is judged on its own: Pass, Fail, Not gradable, or Untested. The scenario result above is based on this test case.

Search restricted to the subset that does not hold the answerPassEvidence
What we sent

Input 1 · No region filter: “request: {"question": "Which depot holds the Tolvan A3 loan pool?", "dataset_ids": ["b09c2f28cbb011f1916c37b82c69031d"]}”

Input 2 · Region: nordic: “request: {"question": "Which depot holds the Tolvan A3 loan pool?", "dataset_ids": ["b09c2f28cbb011f1916c37b82c69031d"], "metadata_condition": {"logic": "and", "conditions": [{"name": "region", "comparison_operator": "=", "value": "nordic"}]}}”

Input 3 · Region: uk: “request: {"question": "Which depot holds the Tolvan A3 loan pool?", "dataset_ids": ["b09c2f28cbb011f1916c37b82c69031d"], "metadata_condition": {"logic": "and", "conditions": [{"name": "region", "comparison_operator": "=", "value": "uk"}]}}”

What the tool returned

Response 1 (No filter (control): A05 ranked 1) is the output of a separate run for Input 1.

Response 2 (Region: nordic (the test): A05 not returned) is the output of a separate run for Input 2; the test is graded on it.

Response 3 (Region: uk (control): A05 ranked 1) is the output of a separate run for Input 3.

Shown first: Response 2 (Region: nordic (the test): A05 not returned), the result this test is graded on.

HTTP 200 code=0 latency=2.34s chunks=3 total=3

=== rank 1 | similarity=0.2882 (vector 0.7493, term 0.0905) | A06_nordic_service_addendum.docx

ItemHeld at BergenNote
Brannoc loan poolTwo unitsIssued against a signed loan note
Tolvan C5 spares kitOne full kitPressure housings, o-ring sets, end caps
ConsumablesRolling stockAnodes, guards, gland kits
Deck cable, armoured300 m drumCut to length on request

=== rank 2 | similarity=0.2789 (vector 0.7418, term 0.0805) | A06_nordic_service_addendum.docx
Nordic Service AddendumFenwake Instruments Ltd - Norway, Sweden and Denmark1. What this addendum coversThis addendum sets out how service work is delivered for customers in Norway, Sweden and Denmark. It covers logistics, customs, mobilisation, the regional depot and how loan stock is requested. It does not restate commercial terms, and it does not describe the goods warranty carried by a new instrument.2. Regional depotThe regional depot is at Bergen, on the Damsgard side of the harbour, and is open 07:00 to 16:00 local time, Monday to Friday. It is staffed by two engineers and a stores controller.2.1 What the depot holdsLoan pool stock is counted on the first working day of each month and the count is sent to the service desk lead the same day. A discrepancy is investigated before the next issue.3. Requesting a loan unit3.1 Who to callLoan requests from customers in the region are met from the Bergen depot. Ring the depot rather than raising a stores request in the system: the stores queue is worked from the workshop and adds a day to anything that could have been handed over the counter.3.2 What can be lentThe Bergen loan pool covers the Brannoc telemetry gateway. A gateway goes out with its own SIM and a configuration file matching the customer's deployment. Where a customer needs an instrument the depot does not hold as loan stock, the depot raises a request against central stores and tells the customer the same day what can and cannot be met locally. Do not promise a loan unit before the depot has confirmed one is free.3.3 The loan noteEvery loan is recorded on a signed loan note carrying the ticket number, the serial number issued and the date it is due back. Ten working days is the standard loan period, counted from the day the customer's own instrument is returned to service. An overdue loan is chased by the stores controller at ten and at twenty working days, and after that by the service desk lead.3.4 Condition on returnA returned loan unit is inspected, cleaned and re-certified before it goes back into the pool. A unit returned with a broken calibration seal is treated as damaged, quoted for repair, and does not go back into the pool until the laboratory has passed it.4. Customs and exportInstruments moving between the workshop and a Norwegian site travel under a temporary admission carnet. The carnet number goes on the ticket before the instrument leaves the building; an instrument that travels without one is held at the border and the ticket clock is suspended until it is released.

=== rank 3 | similarity=0.2221 (vector 0.6934, term 0.0201) | A06_nordic_service_addendum.docx
4.1 Repairs that cross a borderWhere a repair cannot be completed at Bergen and the instrument must return to the workshop, the depot raises a return note and the customer is told the same day. Return shipping is arranged by the depot, never by the customer, so that the carnet stays valid.5. MobilisationOffshore attendance in the region is mobilised through the customer's own vessel wherever one is available. Where it is not, the depot charters through a local agent. Mobilisation requires offshore survival certification current on the day of sailing, and the depot checks certification before booking.6. LanguageService reports are written in English. On request, the depot provides a Norwegian summary of the findings and the actions taken, prepared by the stores controller and checked by the attending engineer.7. SubcontractorsTwo subcontractors are approved for lifting and diving support in the region: Hordaland Subsea AS and Kattegat Marine Services. Neither is authorised to open an instrument or to break a calibration seal.

Show the reply as returned (Markdown)
HTTP 200 code=0 latency=2.34s chunks=3 total=3

=== rank 1 | similarity=0.2882 (vector 0.7493, term 0.0905) | A06_nordic_service_addendum.docx
<table><tr><td>Item</td><td>Held at Bergen</td><td>Note</td></tr><tr><td>Brannoc loan pool</td><td>Two units</td><td>Issued against a signed loan note</td></tr><tr><td>Tolvan C5 spares kit</td><td>One full kit</td><td>Pressure housings, o-ring sets, end caps</td></tr><tr><td>Consumables</td><td>Rolling stock</td><td>Anodes, guards, gland kits</td></tr><tr><td>Deck cable, armoured</td><td>300 m drum</td><td>Cut to length on request</td></tr></table>

=== rank 2 | similarity=0.2789 (vector 0.7418, term 0.0805) | A06_nordic_service_addendum.docx
Nordic Service AddendumFenwake Instruments Ltd - Norway, Sweden and Denmark1. What this addendum coversThis addendum sets out how service work is delivered for customers in Norway, Sweden and Denmark. It covers logistics, customs, mobilisation, the regional depot and how loan stock is requested. It does not restate commercial terms, and it does not describe the goods warranty carried by a new instrument.2. Regional depotThe regional depot is at Bergen, on the Damsgard side of the harbour, and is open 07:00 to 16:00 local time, Monday to Friday. It is staffed by two engineers and a stores controller.2.1 What the depot holdsLoan pool stock is counted on the first working day of each month and the count is sent to the service desk lead the same day. A discrepancy is investigated before the next issue.3. Requesting a loan unit3.1 Who to callLoan requests from customers in the region are met from the Bergen depot. Ring the depot rather than raising a stores request in the system: the stores queue is worked from the workshop and adds a day to anything that could have been handed over the counter.3.2 What can be lentThe Bergen loan pool covers the Brannoc telemetry gateway. A gateway goes out with its own SIM and a configuration file matching the customer's deployment. Where a customer needs an instrument the depot does not hold as loan stock, the depot raises a request against central stores and tells the customer the same day what can and cannot be met locally. Do not promise a loan unit before the depot has confirmed one is free.3.3 The loan noteEvery loan is recorded on a signed loan note carrying the ticket number, the serial number issued and the date it is due back. Ten working days is the standard loan period, counted from the day the customer's own instrument is returned to service. An overdue loan is chased by the stores controller at ten and at twenty working days, and after that by the service desk lead.3.4 Condition on returnA returned loan unit is inspected, cleaned and re-certified before it goes back into the pool. A unit returned with a broken calibration seal is treated as damaged, quoted for repair, and does not go back into the pool until the laboratory has passed it.4. Customs and exportInstruments moving between the workshop and a Norwegian site travel under a temporary admission carnet. The carnet number goes on the ticket before the instrument leaves the building; an instrument that travels without one is held at the border and the ticket clock is suspended until it is released.

=== rank 3 | similarity=0.2221 (vector 0.6934, term 0.0201) | A06_nordic_service_addendum.docx
4.1 Repairs that cross a borderWhere a repair cannot be completed at Bergen and the instrument must return to the workshop, the depot raises a return note and the customer is told the same day. Return shipping is arranged by the depot, never by the customer, so that the carnet stays valid.5. MobilisationOffshore attendance in the region is mobilised through the customer's own vessel wherever one is available. Where it is not, the depot charters through a local agent. Mobilisation requires offshore survival certification current on the day of sailing, and the depot checks certification before booking.6. LanguageService reports are written in English. On request, the depot provides a Norwegian summary of the findings and the actions taken, prepared by the stores controller and checked by the attending engineer.7. SubcontractorsTwo subcontractors are approved for lifting and diving support in the region: Hordaland Subsea AS and Kattegat Marine Services. Neither is authorised to open an instrument or to break a calibration seal.

API transcript: the unrestricted, Nordic and UK requests with their returned passages

Copied from Captured file (text), lines 258–267

Open the text file ↗
Key momentslines 258–269
Everything the tool returned, in order (3)
  1. No filter (control): A05 ranked 1

    HTTP 200 code=0 latency=3.95s chunks=12 total=12

    === rank 1 | similarity=0.3487 (vector 0.7280, term 0.1862) | A05_depot_and_commissioning_note.md

    Depot, spares and commissioning - working note

    Bristol depot and UK commissioning engineers. Not a contractual document.

    The depot

    The Bristol depot sits behind the workshop on the Avonmouth side and is open
    07:00 to 17:00, Monday to Friday. Out of hours, the duty engineer holds a key
    and may draw stock, recording what was taken on the ticket before leaving the
    building.

    Loan stock

    The Bristol depot holds the Tolvan A3 loan pool: six calibrated units reserved for Critical cover customers. A loan unit goes out configured for the customer's
    deployment, with a current certificate in the case, so that it can be rigged
    without a bench check.

    Loan units are issued against a signed loan note naming the ticket, the serial
    number that went out and the serial number it stands in for. The stores
    controller counts loan stock on the first working day of each month.

    A customer on Standard or Extended cover may borrow a unit where one is free,
    but has no reservation on it: a Critical cover customer takes precedence and the
    borrowed unit is recalled with two working days' notice.

    Consumable stock

    Anodes, anti-fouling guards and gland kits are held as rolling stock and
    reordered at the reorder level marked on the bin. The stores controller reviews
    reorder levels each quarter against the previous four quarters of consumption.

    Couriers

    The courier cut-off is 15:30 for next-day delivery within the United Kingdom.
    Anything handed over after the cut-off travels the following working day.
    Dangerous goods - which means any lithium cell over the threshold on the
    shipping matrix - need the packing declaration signed by a trained shipper, and
    there are two in the building.

    What the depot does not do

    The depot does not calibrate. An instrument that needs a certificate goes to the
    laboratory, is booked in under its own job number, and comes back to the depot
    only once the certificate has been signed.

    Commissioning: before travelling

    Confirm the site permit is in place and that the structure is accessible at the
    tide state you have planned for. Confirm the instrument's job number and that
    the certificate in the case matches the serial number on the housing. Take the
    torque wrench; the sensing face is the one part of this job that does not
    tolerate improvisation.

    Commissioning: mounting

    === rank 2 | similarity=0.2882 (vector 0.7493, term 0.0905) | A06_nordic_service_addendum.docx

    ItemHeld at BergenNote
    Brannoc loan poolTwo unitsIssued against a signed loan note
    Tolvan C5 spares kitOne full kitPressure housings, o-ring sets, end caps
    ConsumablesRolling stockAnodes, guards, gland kits
    Deck cable, armoured300 m drumCut to length on request

    === rank 3 | similarity=0.2866 (vector 0.6616, term 0.1258) | A01_field_service_policy_and_charges_uk.pdf

    Fenwake Instruments Ltd
    Field Service Policy and Charges
    United Kingdom operations
    1.Purpose
    This document states what a customer holding a support contract with Fenwake Instruments Ltd may expect when an instrument fails in service, what the service desk in Bristol is obliged to do in response, and what is charged for work that falls outside cover. It applies to the Tolvan A3, the Tolvan C5 and the Brannoc telemetry gateway, on every cover level.
    2. Scope
    Part A covers fault handling: acknowledgement, attendance, spares and escalation. Part B sets out the charges that apply outside cover. Neither part describes the goods warranty carried by a new instrument
    3.Fault priorities
    Every ticket is given a priority when it is raised. The priority is set by the effect on the customer's operation, not by which component failed.
    · Priority 1 - a deployed instrument is not returning data, or is returning data known to be invalid, and no spare is rigged.
    · Priority 2 - an instrument is degraded but usable, or a spare has been rigged and the primary unit is down.
    · Priority 3 - a question, a configuration change, or a fault with no operational effect.
    A priority may be raised by the duty engineer at any point. It is lowered only with the customer's agreement, recorded on the ticket.
    4.Acknowledgement during business hours
    Business hours are 08:00 to 18:00, Monday to Friday, excluding statutory non-working days in England and Wales.Within those hours the service desk is staffed continuously and the targets below are measured from the moment the ticket is raised, by telephone or through the portal, whichever is earlier.
    An acknowledgement is a named engineer taking ownership of the ticket and telling the customer what happens next. An automatic reply from the ticketing system is not an acknowledgement and does not stop the clock.
    4.1 What the target does not cover
    The acknowledgement target is not a repair target. Attendance and parts are dealt with in section 5, and the two clocks run independently: a ticket may be acknowledged inside target and still take several days to close.
    5.Attendance and parts
    Where a fault cannot be cleared remotely, the service desk arranges attendance.Attendance targets are working-day targets and are quoted from the point at which the customer confirms site access.
    5.1Consumables
    Anti-fouling guards, sacrificial anodes and cable glands are consumables. They are replaced during any attendance and charged at the rates in Part B.

    === rank 4 | similarity=0.2789 (vector 0.7418, term 0.0805) | A06_nordic_service_addendum.docx
    Nordic Service AddendumFenwake Instruments Ltd - Norway, Sweden and Denmark1. What this addendum coversThis addendum sets out how service work is delivered for customers in Norway, Sweden and Denmark. It covers logistics, customs, mobilisation, the regional depot and how loan stock is requested. It does not restate commercial terms, and it does not describe the goods warranty carried by a new instrument.2. Regional depotThe regional depot is at Bergen, on the Damsgard side of the harbour, and is open 07:00 to 16:00 local time, Monday to Friday. It is staffed by two engineers and a stores controller.2.1 What the depot holdsLoan pool stock is counted on the first working day of each month and the count is sent to the service desk lead the same day. A discrepancy is investigated before the next issue.3. Requesting a loan unit3.1 Who to callLoan requests from customers in the region are met from the Bergen depot. Ring the depot rather than raising a stores request in the system: the stores queue is worked from the workshop and adds a day to anything that could have been handed over the counter.3.2 What can be lentThe Bergen loan pool covers the Brannoc telemetry gateway. A gateway goes out with its own SIM and a configuration file matching the customer's deployment. Where a customer needs an instrument the depot does not hold as loan stock, the depot raises a request against central stores and tells the customer the same day what can and cannot be met locally. Do not promise a loan unit before the depot has confirmed one is free.3.3 The loan noteEvery loan is recorded on a signed loan note carrying the ticket number, the serial number issued and the date it is due back. Ten working days is the standard loan period, counted from the day the customer's own instrument is returned to service. An overdue loan is chased by the stores controller at ten and at twenty working days, and after that by the service desk lead.3.4 Condition on returnA returned loan unit is inspected, cleaned and re-certified before it goes back into the pool. A unit returned with a broken calibration seal is treated as damaged, quoted for repair, and does not go back into the pool until the laboratory has passed it.4. Customs and exportInstruments moving between the workshop and a Norwegian site travel under a temporary admission carnet. The carnet number goes on the ticket before the instrument leaves the building; an instrument that travels without one is held at the border and the ticket clock is suspended until it is released.

    === rank 5 | similarity=0.2783 (vector 0.6811, term 0.1057) | A09_warranty_statement_service_pack.pdf

    Fenwake Instruments Ltd
    Warranty Terms
    Service pack - warranty terms for the service desk

    1. What is covered
      These are the warranty terms the service desk applies when a customer reports a failure. They apply to every new Tolvan A3 supplied by Fenwake Instruments Ltd, however it was ordered and wherever it is deployed.
      The warranty covers the instrument, its pressure housing, its connector and any cable supplied with it. It covers failure arising from a defect in materials or workmanship. Where a covered failure occurs, Fenwake repairs or exchanges the instrument at its own option and bears the cost of carriage in both directions.
    2. The warranty period
      Every new Tolvan A3 carries a warranty of 36 months from the date the instrument is delivered. The period runs from delivery rather than from commissioning, and is not extended by a repair carried out under it.
      2.1 Instrumentsrepaired underwarranty
      A repaired instrument carries the unexpired balance of the original period, or ninety days from the return of the repaired instrument, whichever ends later.
    3. What is not covered
      · Fouling, corrosion of sacrificial components, and wear of consumables such as anodes, guards and gland kits.
      · Damage caused by a mooring failure, a vessel strike, a snagged cable or any other mechanical event outside the instrument.
      · Damage caused by opening the housing outside a Fenwake workshop, or by breaking a calibration seal.
      · Drift within the published specification. Drift is a calibration matter, not a defect.
      · Any instrument whose serial number has been removed or altered.
    4. Making a claim
      A claim is made through the service desk,quoting the serial number and the delivery note.The service desk raises a ticket, arranges return carriage and tells the customer within five working days whether the failure is covered. Where it is not covered, the customer is quoted for the repair before any work starts.
      4.1 If the customer disagrees
      Where a customer disputes a decision that a failure is not covered, the instrument is held unrepaired and the head of service operations reviews the file. The instrument is not returned, scrapped or repaired while a
      review is open.
    5. Limits
      This warranty is the whole of the remedy for a defective instrument. Fenwake is not liable for loss of data.
      loss of survey time, vessel standby, or any other consequential loss arising from a failure, whether or not that failure is covered.
    6. Statutory rights

    === rank 6 | similarity=0.2774 (vector 0.6781, term 0.1057) | A08_warranty_terms_sales_pack.pdf

    Fenwake Instruments Ltd
    Warranty Terms
    Sales pack - customer-facing warranty terms

    1. What is covered
      These are the warranty terms that accompany a new instrument. They apply to every new Tolvan A3 supplied by Fenwake Instruments Ltd, however it was ordered and wherever it is deployed.
      The warranty covers the instrument, its pressure housing, its connector and any cable supplied with it. It covers failure arising from a defect in materials or workmanship. Where a covered failure occurs, Fenwake repairs or exchanges the instrument at its own option and bears the cost of carriage in both directions.
    2. The warranty period
      Every new Tolvan A3 carries a warranty of 24 months from the date the instrument is delivered. The period runs from delivery rather than from commissioning, and is not extended by a repair carried out under it.
      2.1 Instrumentsrepaired under warranty
      A repaired instrument carries the unexpired balance of the original period, or ninety days from the return of the repaired instrument, whichever ends later.
      3.Whatisnotcovered
      ·Fouling, corrosion of sacrificial components, and wear of consumables such as anodes, guards and gland kits.
      · Damage caused by a mooring failure, a vessel strike, a snagged cable or any other mechanical event outside the instrument.
      · Damage caused by opening the housing outside a Fenwake workshop, or by breaking a calibration seal.
      · Drift within the published specification. Drift is a calibration matter, not a defect.
      · Any instrument whose serial number has been removed or altered.
    3. Making a claim
      A claim is made through the service desk, quoting the serial number and the delivery note. The service desk raises a ticket, arranges return carriage and tells the customer within five working days whether the failure is covered. Where it is not covered, the customer is quoted for the repair before any work starts.
      4.1 If the customer disagrees
      Where a customer disputes a decision that a failure is not covered, the instrument is held unrepaired and the head of service operations reviews the file. The instrument is not returned, scrapped or repaired while a review is open.
    4. Limits
      This warranty is the whole of the remedy for a defective instrument. Fenwake is not liable for loss of data loss of survey time, vessel standby, or any other consequential loss arising from a failure, whether or not that failure is covered.
    5. Statutory rights
      Nothing in these terms affects a consumer's statutory rights. The instruments described here are sold for commercial use, and the terms are written on that basis.

    === rank 7 | similarity=0.2739 (vector 0.7131, term 0.0856) | A10_tolvan_a3_product_overview.md

    Tolvan A3 - product overview

    The Tolvan A3 is a conductivity and temperature sensor built for
    continuous deployment in estuarine and coastal water. It is the instrument most
    of our customers meet first, and most of the questions the service desk answers
    are about this one.

    What it measures

    The instrument reports conductivity, temperature and a derived practical
    salinity. Conductivity is measured with an inductive cell, which has no exposed
    electrodes to foul or to wear, and temperature with a thermistor mounted in the
    same flow path so that the two readings describe the same parcel of water.
    Pressure is not measured; where a depth record is needed, the instrument is
    paired with a separate pressure sensor on the same mooring.

    Where it is used

    Typical deployments are estuary monitoring for a regulator, intake monitoring
    for a water treatment works, and baseline surveys ahead of construction in a
    harbour. It is rated for continuous immersion to fifty metres. Deeper work uses
    the Tolvan C5, which shares the sensing arrangement in a
    pressure housing rated considerably deeper.

    How it is powered and read

    On a mooring, the instrument runs from an internal battery pack and logs to
    internal memory. On a cabled installation it is powered over the same cable
    that carries its data, and reports continuously to the Brannoc
    telemetry gateway, which forwards to the customer's own system. The two modes
    are configured at commissioning and are not switched in the field.

    Fouling and cleaning

    In estuarine water the practical limit on deployment is biological fouling
    rather than power or memory. An anti-fouling guard and a sacrificial anode are
    fitted at commissioning and replaced at each service visit. Customers in warm
    or nutrient-rich water are advised to shorten the interval between visits
    rather than to clean the sensing face themselves, because the inductive cell is
    easily damaged by an abrasive.

    Calibration

    Every instrument leaves the laboratory with a signed certificate recording the
    as-found and as-left bias at four reference points across the working range.
    The recommended recalibration interval for the Tolvan A3 is 22 months from the date of the last certificate. An instrument returned early because of a
    suspected drift is checked as found before anything is adjusted, so that the
    drift can be quantified rather than merely corrected.

    Firmware

    === rank 8 | similarity=0.2252 (vector 0.6426, term 0.0463) | A03_calibration_certificate_scan.pdf

    CALIBRATION CERTIFICATE
    Fenwake Instruments Ltd
    Certificate C-77413
    Calibration laboratoryAvonmouth,Bristol S11
    SERIAL NUMBER
    INSTRUMENT
    FW-A3-40871
    Tolvan A3 conductivity-temperature sensor
    ORDER REFERENCE
    CUSTOMER
    SEMP/PO/9134
    Severn Estuary Monitoring Partnership
    NEXT CALIBRATION DUE
    DATE OF CALIBRATION
    3January 2028
    3March 2026
    AMBIENT
    PROCEDURE
    20.4 C, 61 % RH
    FWLCAL-114,isSue
    Results
    Salinityhanhd ainstrncetandard ou
    Summary
    As-found bias, mean of four points: -0.037 psu As-left bias,mean of four points:-0.004psu Expanded uncertainty (k = 2): 0.008 psu The instrument was adjusted after the as-found check and passed.

    === rank 9 | similarity=0.2221 (vector 0.6934, term 0.0201) | A06_nordic_service_addendum.docx
    4.1 Repairs that cross a borderWhere a repair cannot be completed at Bergen and the instrument must return to the workshop, the depot raises a return note and the customer is told the same day. Return shipping is arranged by the depot, never by the customer, so that the carnet stays valid.5. MobilisationOffshore attendance in the region is mobilised through the customer's own vessel wherever one is available. Where it is not, the depot charters through a local agent. Mobilisation requires offshore survival certification current on the day of sailing, and the depot checks certification before booking.6. LanguageService reports are written in English. On request, the depot provides a Norwegian summary of the findings and the actions taken, prepared by the stores controller and checked by the attending engineer.7. SubcontractorsTwo subcontractors are approved for lifting and diving support in the region: Hordaland Subsea AS and Kattegat Marine Services. Neither is authorised to open an instrument or to break a calibration seal.

    === rank 10 | similarity=0.2133 (vector 0.6171, term 0.0402) | A01_field_service_policy_and_charges_uk.pdf

    10.Review
    Part A is owned by the head of service operations and reviewed each spring with the regional service leads.
    Part B -Charges outside cover
    11.How to read this part
    The charges below apply to work that falls outside the cover level a customer holds: attendance the contract does not include, work in the exclusions at section 9, and any attendance a customer requests at short notice. Work inside cover is not charged.
    A callout is charged once per visit. Where an engineer attends on two consecutive days, the second day is charged at the day rate rather than as a second callout.
    12. Callout and attendance charges
    All figures in pounds sterling, excluding VAT.
    Out-of-hours means any call answered outside 08:00 to 18:00,Monday to Friday,and any call answered ona statutory non-working day. The offshore day rate applies to any work carried out from a vessel, whether or not the vessel is under way.
    13. Consumables and parts
    Consumables fitted during an attendance are charged at list. Parts drawn from a regional depot carry no handling charge; parts couriered from the central store carry the courier cost at invoice.
    14.Travel
    Travel inside a fifty-mile radius of the Bristol workshop is included in the callout charge. Beyond that radius, travel is charged per mile at the rate in the customer's contract schedule, and any overnight stay is charged at cost.
    15. Quotations
    Any work expected to exceed two days is quoted in writing before it starts. A quotation holds for sixty days.

    === rank 11 | similarity=0.2129 (vector 0.6628, term 0.0201) | A01_field_service_policy_and_charges_uk.pdf

    Cover levelAttendance targetSpares held
    StandardFive working daysCentral store only
    ExtendedThree working daysCentral store only
    CriticalNext working dayRegional depot

    === rank 12 | similarity=0.2102 (vector 0.5927, term 0.0463) | A10_tolvan_a3_product_overview.md
    Firmware is updated during a service visit rather than over the telemetry link,
    because an interrupted update on a deployed instrument leaves it unreadable
    until it is recovered. A customer who declines a recommended update is asked to
    confirm in writing, and the confirmation is attached to the instrument record.

    Show the reply as returned (Markdown)
    HTTP 200 code=0 latency=3.95s chunks=12 total=12
    
    === rank 1 | similarity=0.3487 (vector 0.7280, term 0.1862) | A05_depot_and_commissioning_note.md
    # Depot, spares and commissioning - working note
    Bristol depot and UK commissioning engineers. Not a contractual document.
    ## The depot
    The Bristol depot sits behind the workshop on the Avonmouth side and is open
    07:00 to 17:00, Monday to Friday. Out of hours, the duty engineer holds a key
    and may draw stock, recording what was taken on the ticket before leaving the
    building.
    ## Loan stock
    The Bristol depot holds the Tolvan A3 loan pool: six calibrated units reserved for Critical cover customers. A loan unit goes out configured for the customer's
    deployment, with a current certificate in the case, so that it can be rigged
    without a bench check.
    
    Loan units are issued against a signed loan note naming the ticket, the serial
    number that went out and the serial number it stands in for. The stores
    controller counts loan stock on the first working day of each month.
    
    A customer on Standard or Extended cover may borrow a unit where one is free,
    but has no reservation on it: a Critical cover customer takes precedence and the
    borrowed unit is recalled with two working days' notice.
    ## Consumable stock
    Anodes, anti-fouling guards and gland kits are held as rolling stock and
    reordered at the reorder level marked on the bin. The stores controller reviews
    reorder levels each quarter against the previous four quarters of consumption.
    ## Couriers
    The courier cut-off is 15:30 for next-day delivery within the United Kingdom.
    Anything handed over after the cut-off travels the following working day.
    Dangerous goods - which means any lithium cell over the threshold on the
    shipping matrix - need the packing declaration signed by a trained shipper, and
    there are two in the building.
    ## What the depot does not do
    The depot does not calibrate. An instrument that needs a certificate goes to the
    laboratory, is booked in under its own job number, and comes back to the depot
    only once the certificate has been signed.
    ## Commissioning: before travelling
    Confirm the site permit is in place and that the structure is accessible at the
    tide state you have planned for. Confirm the instrument's job number and that
    the certificate in the case matches the serial number on the housing. Take the
    torque wrench; the sensing face is the one part of this job that does not
    tolerate improvisation.
    ## Commissioning: mounting
    
    === rank 2 | similarity=0.2882 (vector 0.7493, term 0.0905) | A06_nordic_service_addendum.docx
    <table><tr><td>Item</td><td>Held at Bergen</td><td>Note</td></tr><tr><td>Brannoc loan pool</td><td>Two units</td><td>Issued against a signed loan note</td></tr><tr><td>Tolvan C5 spares kit</td><td>One full kit</td><td>Pressure housings, o-ring sets, end caps</td></tr><tr><td>Consumables</td><td>Rolling stock</td><td>Anodes, guards, gland kits</td></tr><tr><td>Deck cable, armoured</td><td>300 m drum</td><td>Cut to length on request</td></tr></table>
    
    === rank 3 | similarity=0.2866 (vector 0.6616, term 0.1258) | A01_field_service_policy_and_charges_uk.pdf
    
    Fenwake Instruments Ltd
    Field Service Policy and Charges
    United Kingdom operations
    1.Purpose
    This document states what a customer holding a support contract with Fenwake Instruments Ltd may expect when an instrument fails in service, what the service desk in Bristol is obliged to do in response, and what is charged for work that falls outside cover. It applies to the Tolvan A3, the Tolvan C5 and the Brannoc telemetry gateway, on every cover level.
    2. Scope
    Part A covers fault handling: acknowledgement, attendance, spares and escalation. Part B sets out the charges that apply outside cover. Neither part describes the goods warranty carried by a new instrument
    3.Fault priorities
    Every ticket is given a priority when it is raised. The priority is set by the effect on the customer's operation, not by which component failed.
    · Priority 1 - a deployed instrument is not returning data, or is returning data known to be invalid, and no spare is rigged.
    · Priority 2 - an instrument is degraded but usable, or a spare has been rigged and the primary unit is down.
    · Priority 3 - a question, a configuration change, or a fault with no operational effect.
    A priority may be raised by the duty engineer at any point. It is lowered only with the customer's agreement, recorded on the ticket.
    4.Acknowledgement during business hours
    Business hours are 08:00 to 18:00, Monday to Friday, excluding statutory non-working days in England and Wales.Within those hours the service desk is staffed continuously and the targets below are measured from the moment the ticket is raised, by telephone or through the portal, whichever is earlier.
    An acknowledgement is a named engineer taking ownership of the ticket and telling the customer what happens next. An automatic reply from the ticketing system is not an acknowledgement and does not stop the clock.
    4.1 What the target does not cover
    The acknowledgement target is not a repair target. Attendance and parts are dealt with in section 5, and the two clocks run independently: a ticket may be acknowledged inside target and still take several days to close.
    5.Attendance and parts
    Where a fault cannot be cleared remotely, the service desk arranges attendance.Attendance targets are working-day targets and are quoted from the point at which the customer confirms site access.
    5.1Consumables
    Anti-fouling guards, sacrificial anodes and cable glands are consumables. They are replaced during any attendance and charged at the rates in Part B.
    
    === rank 4 | similarity=0.2789 (vector 0.7418, term 0.0805) | A06_nordic_service_addendum.docx
    Nordic Service AddendumFenwake Instruments Ltd - Norway, Sweden and Denmark1. What this addendum coversThis addendum sets out how service work is delivered for customers in Norway, Sweden and Denmark. It covers logistics, customs, mobilisation, the regional depot and how loan stock is requested. It does not restate commercial terms, and it does not describe the goods warranty carried by a new instrument.2. Regional depotThe regional depot is at Bergen, on the Damsgard side of the harbour, and is open 07:00 to 16:00 local time, Monday to Friday. It is staffed by two engineers and a stores controller.2.1 What the depot holdsLoan pool stock is counted on the first working day of each month and the count is sent to the service desk lead the same day. A discrepancy is investigated before the next issue.3. Requesting a loan unit3.1 Who to callLoan requests from customers in the region are met from the Bergen depot. Ring the depot rather than raising a stores request in the system: the stores queue is worked from the workshop and adds a day to anything that could have been handed over the counter.3.2 What can be lentThe Bergen loan pool covers the Brannoc telemetry gateway. A gateway goes out with its own SIM and a configuration file matching the customer's deployment. Where a customer needs an instrument the depot does not hold as loan stock, the depot raises a request against central stores and tells the customer the same day what can and cannot be met locally. Do not promise a loan unit before the depot has confirmed one is free.3.3 The loan noteEvery loan is recorded on a signed loan note carrying the ticket number, the serial number issued and the date it is due back. Ten working days is the standard loan period, counted from the day the customer's own instrument is returned to service. An overdue loan is chased by the stores controller at ten and at twenty working days, and after that by the service desk lead.3.4 Condition on returnA returned loan unit is inspected, cleaned and re-certified before it goes back into the pool. A unit returned with a broken calibration seal is treated as damaged, quoted for repair, and does not go back into the pool until the laboratory has passed it.4. Customs and exportInstruments moving between the workshop and a Norwegian site travel under a temporary admission carnet. The carnet number goes on the ticket before the instrument leaves the building; an instrument that travels without one is held at the border and the ticket clock is suspended until it is released.
    
    === rank 5 | similarity=0.2783 (vector 0.6811, term 0.1057) | A09_warranty_statement_service_pack.pdf
    
    Fenwake Instruments Ltd
    Warranty Terms
    Service pack - warranty terms for the service desk
    1. What is covered
    These are the warranty terms the service desk applies when a customer reports a failure. They apply to every new Tolvan A3 supplied by Fenwake Instruments Ltd, however it was ordered and wherever it is deployed.
    The warranty covers the instrument, its pressure housing, its connector and any cable supplied with it. It covers failure arising from a defect in materials or workmanship. Where a covered failure occurs, Fenwake repairs or exchanges the instrument at its own option and bears the cost of carriage in both directions.
    2. The warranty period
    Every new Tolvan A3 carries a warranty of 36 months from the date the instrument is delivered. The period runs from delivery rather than from commissioning, and is not extended by a repair carried out under it.
    2.1 Instrumentsrepaired underwarranty
    A repaired instrument carries the unexpired balance of the original period, or ninety days from the return of the repaired instrument, whichever ends later.
    3. What is not covered
    · Fouling, corrosion of sacrificial components, and wear of consumables such as anodes, guards and gland kits.
    · Damage caused by a mooring failure, a vessel strike, a snagged cable or any other mechanical event outside the instrument.
    · Damage caused by opening the housing outside a Fenwake workshop, or by breaking a calibration seal.
    · Drift within the published specification. Drift is a calibration matter, not a defect.
    · Any instrument whose serial number has been removed or altered.
    4. Making a claim
    A claim is made through the service desk,quoting the serial number and the delivery note.The service desk raises a ticket, arranges return carriage and tells the customer within five working days whether the failure is covered. Where it is not covered, the customer is quoted for the repair before any work starts.
    4.1 If the customer disagrees
    Where a customer disputes a decision that a failure is not covered, the instrument is held unrepaired and the head of service operations reviews the file. The instrument is not returned, scrapped or repaired while a
    review is open.
    5. Limits
    This warranty is the whole of the remedy for a defective instrument. Fenwake is not liable for loss of data.
    loss of survey time, vessel standby, or any other consequential loss arising from a failure, whether or not that failure is covered.
    6. Statutory rights
    
    === rank 6 | similarity=0.2774 (vector 0.6781, term 0.1057) | A08_warranty_terms_sales_pack.pdf
    
    Fenwake Instruments Ltd
    Warranty Terms
    Sales pack - customer-facing warranty terms
    1. What is covered
    These are the warranty terms that accompany a new instrument. They apply to every new Tolvan A3 supplied by Fenwake Instruments Ltd, however it was ordered and wherever it is deployed.
    The warranty covers the instrument, its pressure housing, its connector and any cable supplied with it. It covers failure arising from a defect in materials or workmanship. Where a covered failure occurs, Fenwake repairs or exchanges the instrument at its own option and bears the cost of carriage in both directions.
    2. The warranty period
    Every new Tolvan A3 carries a warranty of 24 months from the date the instrument is delivered. The period runs from delivery rather than from commissioning, and is not extended by a repair carried out under it.
    2.1 Instrumentsrepaired under warranty
    A repaired instrument carries the unexpired balance of the original period, or ninety days from the return of the repaired instrument, whichever ends later.
    3.Whatisnotcovered
    ·Fouling, corrosion of sacrificial components, and wear of consumables such as anodes, guards and gland kits.
    · Damage caused by a mooring failure, a vessel strike, a snagged cable or any other mechanical event outside the instrument.
    · Damage caused by opening the housing outside a Fenwake workshop, or by breaking a calibration seal.
    · Drift within the published specification. Drift is a calibration matter, not a defect.
    · Any instrument whose serial number has been removed or altered.
    4. Making a claim
    A claim is made through the service desk, quoting the serial number and the delivery note. The service desk raises a ticket, arranges return carriage and tells the customer within five working days whether the failure is covered. Where it is not covered, the customer is quoted for the repair before any work starts.
    4.1 If the customer disagrees
    Where a customer disputes a decision that a failure is not covered, the instrument is held unrepaired and the head of service operations reviews the file. The instrument is not returned, scrapped or repaired while a review is open.
    5. Limits
    This warranty is the whole of the remedy for a defective instrument. Fenwake is not liable for loss of data loss of survey time, vessel standby, or any other consequential loss arising from a failure, whether or not that failure is covered.
    6. Statutory rights
    Nothing in these terms affects a consumer's statutory rights. The instruments described here are sold for commercial use, and the terms are written on that basis.
    
    === rank 7 | similarity=0.2739 (vector 0.7131, term 0.0856) | A10_tolvan_a3_product_overview.md
    # Tolvan A3 - product overview
    The Tolvan A3 is a conductivity and temperature sensor built for
    continuous deployment in estuarine and coastal water. It is the instrument most
    of our customers meet first, and most of the questions the service desk answers
    are about this one.
    ## What it measures
    The instrument reports conductivity, temperature and a derived practical
    salinity. Conductivity is measured with an inductive cell, which has no exposed
    electrodes to foul or to wear, and temperature with a thermistor mounted in the
    same flow path so that the two readings describe the same parcel of water.
    Pressure is not measured; where a depth record is needed, the instrument is
    paired with a separate pressure sensor on the same mooring.
    ## Where it is used
    Typical deployments are estuary monitoring for a regulator, intake monitoring
    for a water treatment works, and baseline surveys ahead of construction in a
    harbour. It is rated for continuous immersion to fifty metres. Deeper work uses
    the Tolvan C5, which shares the sensing arrangement in a
    pressure housing rated considerably deeper.
    ## How it is powered and read
    On a mooring, the instrument runs from an internal battery pack and logs to
    internal memory. On a cabled installation it is powered over the same cable
    that carries its data, and reports continuously to the Brannoc
    telemetry gateway, which forwards to the customer's own system. The two modes
    are configured at commissioning and are not switched in the field.
    ## Fouling and cleaning
    In estuarine water the practical limit on deployment is biological fouling
    rather than power or memory. An anti-fouling guard and a sacrificial anode are
    fitted at commissioning and replaced at each service visit. Customers in warm
    or nutrient-rich water are advised to shorten the interval between visits
    rather than to clean the sensing face themselves, because the inductive cell is
    easily damaged by an abrasive.
    ## Calibration
    Every instrument leaves the laboratory with a signed certificate recording the
    as-found and as-left bias at four reference points across the working range.
    The recommended recalibration interval for the Tolvan A3 is 22 months from the date of the last certificate. An instrument returned early because of a
    suspected drift is checked as found before anything is adjusted, so that the
    drift can be quantified rather than merely corrected.
    ## Firmware
    
    === rank 8 | similarity=0.2252 (vector 0.6426, term 0.0463) | A03_calibration_certificate_scan.pdf
    
    CALIBRATION CERTIFICATE
    Fenwake Instruments Ltd
    Certificate C-77413
    Calibration laboratoryAvonmouth,Bristol S11
    SERIAL NUMBER
    INSTRUMENT
    FW-A3-40871
    Tolvan A3 conductivity-temperature sensor
    ORDER REFERENCE
    CUSTOMER
    SEMP/PO/9134
    Severn Estuary Monitoring Partnership
    NEXT CALIBRATION DUE
    DATE OF CALIBRATION
    3January 2028
    3March 2026
    AMBIENT
    PROCEDURE
    20.4 C, 61 % RH
    FWLCAL-114,isSue
    Results
    Salinityhanhd ainstrncetandard ou
    Summary
    As-found bias, mean of four points: -0.037 psu As-left bias,mean of four points:-0.004psu Expanded uncertainty (k = 2): 0.008 psu The instrument was adjusted after the as-found check and passed.
    
    === rank 9 | similarity=0.2221 (vector 0.6934, term 0.0201) | A06_nordic_service_addendum.docx
    4.1 Repairs that cross a borderWhere a repair cannot be completed at Bergen and the instrument must return to the workshop, the depot raises a return note and the customer is told the same day. Return shipping is arranged by the depot, never by the customer, so that the carnet stays valid.5. MobilisationOffshore attendance in the region is mobilised through the customer's own vessel wherever one is available. Where it is not, the depot charters through a local agent. Mobilisation requires offshore survival certification current on the day of sailing, and the depot checks certification before booking.6. LanguageService reports are written in English. On request, the depot provides a Norwegian summary of the findings and the actions taken, prepared by the stores controller and checked by the attending engineer.7. SubcontractorsTwo subcontractors are approved for lifting and diving support in the region: Hordaland Subsea AS and Kattegat Marine Services. Neither is authorised to open an instrument or to break a calibration seal.
    
    === rank 10 | similarity=0.2133 (vector 0.6171, term 0.0402) | A01_field_service_policy_and_charges_uk.pdf
    
    10.Review
    Part A is owned by the head of service operations and reviewed each spring with the regional service leads.
    Part B -Charges outside cover
    11.How to read this part
    The charges below apply to work that falls outside the cover level a customer holds: attendance the contract does not include, work in the exclusions at section 9, and any attendance a customer requests at short notice. Work inside cover is not charged.
    A callout is charged once per visit. Where an engineer attends on two consecutive days, the second day is charged at the day rate rather than as a second callout.
    12. Callout and attendance charges
    All figures in pounds sterling, excluding VAT.
    Out-of-hours means any call answered outside 08:00 to 18:00,Monday to Friday,and any call answered ona statutory non-working day. The offshore day rate applies to any work carried out from a vessel, whether or not the vessel is under way.
    13. Consumables and parts
    Consumables fitted during an attendance are charged at list. Parts drawn from a regional depot carry no handling charge; parts couriered from the central store carry the courier cost at invoice.
    14.Travel
    Travel inside a fifty-mile radius of the Bristol workshop is included in the callout charge. Beyond that radius, travel is charged per mile at the rate in the customer's contract schedule, and any overnight stay is charged at cost.
    15. Quotations
    Any work expected to exceed two days is quoted in writing before it starts. A quotation holds for sixty days.
    
    === rank 11 | similarity=0.2129 (vector 0.6628, term 0.0201) | A01_field_service_policy_and_charges_uk.pdf
    <table><tr><td >Cover level</td><td >Attendance target</td><td >Spares held</td></tr><tr><td >Standard</td><td >Five working days</td><td > Central store only</td></tr><tr><td >Extended</td><td >Three working days</td><td >Central store only</td></tr><tr><td >Critical</td><td >Next working day</td><td >Regional depot</td></tr></table>
    
    === rank 12 | similarity=0.2102 (vector 0.5927, term 0.0463) | A10_tolvan_a3_product_overview.md
    Firmware is updated during a service visit rather than over the telemetry link,
    because an interrupted update on a deployed instrument leaves it unreadable
    until it is recovered. A customer who declines a recommended update is asked to
    confirm in writing, and the confirmation is attached to the instrument record.
  2. Region: nordic (the test): A05 not returned

    The result this test is graded on, printed above.

  3. Region: uk (control): A05 ranked 1

    HTTP 200 code=0 latency=2.10s chunks=5 total=5

    === rank 1 | similarity=0.3487 (vector 0.7280, term 0.1862) | A05_depot_and_commissioning_note.md

    Depot, spares and commissioning - working note

    Bristol depot and UK commissioning engineers. Not a contractual document.

    The depot

    The Bristol depot sits behind the workshop on the Avonmouth side and is open
    07:00 to 17:00, Monday to Friday. Out of hours, the duty engineer holds a key
    and may draw stock, recording what was taken on the ticket before leaving the
    building.

    Loan stock

    The Bristol depot holds the Tolvan A3 loan pool: six calibrated units reserved for Critical cover customers. A loan unit goes out configured for the customer's
    deployment, with a current certificate in the case, so that it can be rigged
    without a bench check.

    Loan units are issued against a signed loan note naming the ticket, the serial
    number that went out and the serial number it stands in for. The stores
    controller counts loan stock on the first working day of each month.

    A customer on Standard or Extended cover may borrow a unit where one is free,
    but has no reservation on it: a Critical cover customer takes precedence and the
    borrowed unit is recalled with two working days' notice.

    Consumable stock

    Anodes, anti-fouling guards and gland kits are held as rolling stock and
    reordered at the reorder level marked on the bin. The stores controller reviews
    reorder levels each quarter against the previous four quarters of consumption.

    Couriers

    The courier cut-off is 15:30 for next-day delivery within the United Kingdom.
    Anything handed over after the cut-off travels the following working day.
    Dangerous goods - which means any lithium cell over the threshold on the
    shipping matrix - need the packing declaration signed by a trained shipper, and
    there are two in the building.

    What the depot does not do

    The depot does not calibrate. An instrument that needs a certificate goes to the
    laboratory, is booked in under its own job number, and comes back to the depot
    only once the certificate has been signed.

    Commissioning: before travelling

    Confirm the site permit is in place and that the structure is accessible at the
    tide state you have planned for. Confirm the instrument's job number and that
    the certificate in the case matches the serial number on the housing. Take the
    torque wrench; the sensing face is the one part of this job that does not
    tolerate improvisation.

    Commissioning: mounting

    === rank 2 | similarity=0.2866 (vector 0.6616, term 0.1258) | A01_field_service_policy_and_charges_uk.pdf

    Fenwake Instruments Ltd
    Field Service Policy and Charges
    United Kingdom operations
    1.Purpose
    This document states what a customer holding a support contract with Fenwake Instruments Ltd may expect when an instrument fails in service, what the service desk in Bristol is obliged to do in response, and what is charged for work that falls outside cover. It applies to the Tolvan A3, the Tolvan C5 and the Brannoc telemetry gateway, on every cover level.
    2. Scope
    Part A covers fault handling: acknowledgement, attendance, spares and escalation. Part B sets out the charges that apply outside cover. Neither part describes the goods warranty carried by a new instrument
    3.Fault priorities
    Every ticket is given a priority when it is raised. The priority is set by the effect on the customer's operation, not by which component failed.
    · Priority 1 - a deployed instrument is not returning data, or is returning data known to be invalid, and no spare is rigged.
    · Priority 2 - an instrument is degraded but usable, or a spare has been rigged and the primary unit is down.
    · Priority 3 - a question, a configuration change, or a fault with no operational effect.
    A priority may be raised by the duty engineer at any point. It is lowered only with the customer's agreement, recorded on the ticket.
    4.Acknowledgement during business hours
    Business hours are 08:00 to 18:00, Monday to Friday, excluding statutory non-working days in England and Wales.Within those hours the service desk is staffed continuously and the targets below are measured from the moment the ticket is raised, by telephone or through the portal, whichever is earlier.
    An acknowledgement is a named engineer taking ownership of the ticket and telling the customer what happens next. An automatic reply from the ticketing system is not an acknowledgement and does not stop the clock.
    4.1 What the target does not cover
    The acknowledgement target is not a repair target. Attendance and parts are dealt with in section 5, and the two clocks run independently: a ticket may be acknowledged inside target and still take several days to close.
    5.Attendance and parts
    Where a fault cannot be cleared remotely, the service desk arranges attendance.Attendance targets are working-day targets and are quoted from the point at which the customer confirms site access.
    5.1Consumables
    Anti-fouling guards, sacrificial anodes and cable glands are consumables. They are replaced during any attendance and charged at the rates in Part B.

    === rank 3 | similarity=0.2252 (vector 0.6426, term 0.0463) | A03_calibration_certificate_scan.pdf

    CALIBRATION CERTIFICATE
    Fenwake Instruments Ltd
    Certificate C-77413
    Calibration laboratoryAvonmouth,Bristol S11
    SERIAL NUMBER
    INSTRUMENT
    FW-A3-40871
    Tolvan A3 conductivity-temperature sensor
    ORDER REFERENCE
    CUSTOMER
    SEMP/PO/9134
    Severn Estuary Monitoring Partnership
    NEXT CALIBRATION DUE
    DATE OF CALIBRATION
    3January 2028
    3March 2026
    AMBIENT
    PROCEDURE
    20.4 C, 61 % RH
    FWLCAL-114,isSue
    Results
    Salinityhanhd ainstrncetandard ou
    Summary
    As-found bias, mean of four points: -0.037 psu As-left bias,mean of four points:-0.004psu Expanded uncertainty (k = 2): 0.008 psu The instrument was adjusted after the as-found check and passed.

    === rank 4 | similarity=0.2133 (vector 0.6171, term 0.0402) | A01_field_service_policy_and_charges_uk.pdf

    10.Review
    Part A is owned by the head of service operations and reviewed each spring with the regional service leads.
    Part B -Charges outside cover
    11.How to read this part
    The charges below apply to work that falls outside the cover level a customer holds: attendance the contract does not include, work in the exclusions at section 9, and any attendance a customer requests at short notice. Work inside cover is not charged.
    A callout is charged once per visit. Where an engineer attends on two consecutive days, the second day is charged at the day rate rather than as a second callout.
    12. Callout and attendance charges
    All figures in pounds sterling, excluding VAT.
    Out-of-hours means any call answered outside 08:00 to 18:00,Monday to Friday,and any call answered ona statutory non-working day. The offshore day rate applies to any work carried out from a vessel, whether or not the vessel is under way.
    13. Consumables and parts
    Consumables fitted during an attendance are charged at list. Parts drawn from a regional depot carry no handling charge; parts couriered from the central store carry the courier cost at invoice.
    14.Travel
    Travel inside a fifty-mile radius of the Bristol workshop is included in the callout charge. Beyond that radius, travel is charged per mile at the rate in the customer's contract schedule, and any overnight stay is charged at cost.
    15. Quotations
    Any work expected to exceed two days is quoted in writing before it starts. A quotation holds for sixty days.

    === rank 5 | similarity=0.2129 (vector 0.6628, term 0.0201) | A01_field_service_policy_and_charges_uk.pdf

    Cover levelAttendance targetSpares held
    StandardFive working daysCentral store only
    ExtendedThree working daysCentral store only
    CriticalNext working dayRegional depot
    Show the reply as returned (Markdown)
    HTTP 200 code=0 latency=2.10s chunks=5 total=5
    
    === rank 1 | similarity=0.3487 (vector 0.7280, term 0.1862) | A05_depot_and_commissioning_note.md
    # Depot, spares and commissioning - working note
    Bristol depot and UK commissioning engineers. Not a contractual document.
    ## The depot
    The Bristol depot sits behind the workshop on the Avonmouth side and is open
    07:00 to 17:00, Monday to Friday. Out of hours, the duty engineer holds a key
    and may draw stock, recording what was taken on the ticket before leaving the
    building.
    ## Loan stock
    The Bristol depot holds the Tolvan A3 loan pool: six calibrated units reserved for Critical cover customers. A loan unit goes out configured for the customer's
    deployment, with a current certificate in the case, so that it can be rigged
    without a bench check.
    
    Loan units are issued against a signed loan note naming the ticket, the serial
    number that went out and the serial number it stands in for. The stores
    controller counts loan stock on the first working day of each month.
    
    A customer on Standard or Extended cover may borrow a unit where one is free,
    but has no reservation on it: a Critical cover customer takes precedence and the
    borrowed unit is recalled with two working days' notice.
    ## Consumable stock
    Anodes, anti-fouling guards and gland kits are held as rolling stock and
    reordered at the reorder level marked on the bin. The stores controller reviews
    reorder levels each quarter against the previous four quarters of consumption.
    ## Couriers
    The courier cut-off is 15:30 for next-day delivery within the United Kingdom.
    Anything handed over after the cut-off travels the following working day.
    Dangerous goods - which means any lithium cell over the threshold on the
    shipping matrix - need the packing declaration signed by a trained shipper, and
    there are two in the building.
    ## What the depot does not do
    The depot does not calibrate. An instrument that needs a certificate goes to the
    laboratory, is booked in under its own job number, and comes back to the depot
    only once the certificate has been signed.
    ## Commissioning: before travelling
    Confirm the site permit is in place and that the structure is accessible at the
    tide state you have planned for. Confirm the instrument's job number and that
    the certificate in the case matches the serial number on the housing. Take the
    torque wrench; the sensing face is the one part of this job that does not
    tolerate improvisation.
    ## Commissioning: mounting
    
    === rank 2 | similarity=0.2866 (vector 0.6616, term 0.1258) | A01_field_service_policy_and_charges_uk.pdf
    
    Fenwake Instruments Ltd
    Field Service Policy and Charges
    United Kingdom operations
    1.Purpose
    This document states what a customer holding a support contract with Fenwake Instruments Ltd may expect when an instrument fails in service, what the service desk in Bristol is obliged to do in response, and what is charged for work that falls outside cover. It applies to the Tolvan A3, the Tolvan C5 and the Brannoc telemetry gateway, on every cover level.
    2. Scope
    Part A covers fault handling: acknowledgement, attendance, spares and escalation. Part B sets out the charges that apply outside cover. Neither part describes the goods warranty carried by a new instrument
    3.Fault priorities
    Every ticket is given a priority when it is raised. The priority is set by the effect on the customer's operation, not by which component failed.
    · Priority 1 - a deployed instrument is not returning data, or is returning data known to be invalid, and no spare is rigged.
    · Priority 2 - an instrument is degraded but usable, or a spare has been rigged and the primary unit is down.
    · Priority 3 - a question, a configuration change, or a fault with no operational effect.
    A priority may be raised by the duty engineer at any point. It is lowered only with the customer's agreement, recorded on the ticket.
    4.Acknowledgement during business hours
    Business hours are 08:00 to 18:00, Monday to Friday, excluding statutory non-working days in England and Wales.Within those hours the service desk is staffed continuously and the targets below are measured from the moment the ticket is raised, by telephone or through the portal, whichever is earlier.
    An acknowledgement is a named engineer taking ownership of the ticket and telling the customer what happens next. An automatic reply from the ticketing system is not an acknowledgement and does not stop the clock.
    4.1 What the target does not cover
    The acknowledgement target is not a repair target. Attendance and parts are dealt with in section 5, and the two clocks run independently: a ticket may be acknowledged inside target and still take several days to close.
    5.Attendance and parts
    Where a fault cannot be cleared remotely, the service desk arranges attendance.Attendance targets are working-day targets and are quoted from the point at which the customer confirms site access.
    5.1Consumables
    Anti-fouling guards, sacrificial anodes and cable glands are consumables. They are replaced during any attendance and charged at the rates in Part B.
    
    === rank 3 | similarity=0.2252 (vector 0.6426, term 0.0463) | A03_calibration_certificate_scan.pdf
    
    CALIBRATION CERTIFICATE
    Fenwake Instruments Ltd
    Certificate C-77413
    Calibration laboratoryAvonmouth,Bristol S11
    SERIAL NUMBER
    INSTRUMENT
    FW-A3-40871
    Tolvan A3 conductivity-temperature sensor
    ORDER REFERENCE
    CUSTOMER
    SEMP/PO/9134
    Severn Estuary Monitoring Partnership
    NEXT CALIBRATION DUE
    DATE OF CALIBRATION
    3January 2028
    3March 2026
    AMBIENT
    PROCEDURE
    20.4 C, 61 % RH
    FWLCAL-114,isSue
    Results
    Salinityhanhd ainstrncetandard ou
    Summary
    As-found bias, mean of four points: -0.037 psu As-left bias,mean of four points:-0.004psu Expanded uncertainty (k = 2): 0.008 psu The instrument was adjusted after the as-found check and passed.
    
    === rank 4 | similarity=0.2133 (vector 0.6171, term 0.0402) | A01_field_service_policy_and_charges_uk.pdf
    
    10.Review
    Part A is owned by the head of service operations and reviewed each spring with the regional service leads.
    Part B -Charges outside cover
    11.How to read this part
    The charges below apply to work that falls outside the cover level a customer holds: attendance the contract does not include, work in the exclusions at section 9, and any attendance a customer requests at short notice. Work inside cover is not charged.
    A callout is charged once per visit. Where an engineer attends on two consecutive days, the second day is charged at the day rate rather than as a second callout.
    12. Callout and attendance charges
    All figures in pounds sterling, excluding VAT.
    Out-of-hours means any call answered outside 08:00 to 18:00,Monday to Friday,and any call answered ona statutory non-working day. The offshore day rate applies to any work carried out from a vessel, whether or not the vessel is under way.
    13. Consumables and parts
    Consumables fitted during an attendance are charged at list. Parts drawn from a regional depot carry no handling charge; parts couriered from the central store carry the courier cost at invoice.
    14.Travel
    Travel inside a fifty-mile radius of the Bristol workshop is included in the callout charge. Beyond that radius, travel is charged per mile at the rate in the customer's contract schedule, and any overnight stay is charged at cost.
    15. Quotations
    Any work expected to exceed two days is quoted in writing before it starts. A quotation holds for sixty days.
    
    === rank 5 | similarity=0.2129 (vector 0.6628, term 0.0201) | A01_field_service_policy_and_charges_uk.pdf
    <table><tr><td >Cover level</td><td >Attendance target</td><td >Spares held</td></tr><tr><td >Standard</td><td >Five working days</td><td > Central store only</td></tr><tr><td >Extended</td><td >Three working days</td><td >Central store only</td></tr><tr><td >Critical</td><td >Next working day</td><td >Regional depot</td></tr></table>
Expected vs. Found
✓Expected: Do not return the document containing the answer when it lies outside the chosen document subset.Found: The Nordic search returned three passages, all from the Nordic service addendum, and no passage from the depot and commissioning note containing the answer.
Supporting proof
Proof 1Screenshot
Notebook screenshot: document rankings for the unrestricted, Nordic and UK searches
Open original ↗
Why this result

Excluding the answering document was required even though it could be retrieved elsewhere. The restricted search still found related material, so its omission demonstrates a respected restriction rather than an empty search or an ignored filter.

Tested by Vivek Tomar · evidence dated 21 October 2026

Configuration and setup

How this tool was set up for the run and what the test needed in place. Each row is a fact from the run's records; a fact the records do not hold is left out, not guessed.

Software that produced the output
RAGFlow
Build or version
v0.26.4
Plan or tier
Starter
Surface
API
Set up before the run
The question concerned the Tolvan A3 loan pool’s depot. The Bristol answer had to be confined to the UK depot note, with related Nordic service material available for a region-restricted search that excluded the answering document.
Metadata filter
region equals nordic
Tested
21 October 2026 · Vivek Tomar

How this scenario is graded

How we decide Pass, Fail and Not gradable. The same rules apply to every tool tested on this scenario.

How results are decided

Each test case gets one result per tool: Pass, Fail or Not gradable. A test case we haven't run yet shows Untested. There are no partial results.

The rules
  • Pass: the tool did everything the test expected, and nothing it said contradicts the correct answer.
  • Fail: at least one expected behaviour clearly didn't happen; the test case's result says which one and quotes the tool.
  • Not gradable: our evidence couldn't settle the outcome (for example a record we needed is missing). It is never counted as a fail, and the test case's result says what's missing.

Where this sits in the benchmark

This page is one cell of a larger study: one tool, one scenario. Only this benchmark's frame appears here.

LevelNameScope
BenchmarkManaged RAG →15 scenarios · 9 tools
CapabilityRetrieval →
ScenarioRetrieval is scoped to part of the documents →
ToolRAGFlow →

History of this result

What has happened to this result since it was first published. Runs and grades are never overwritten: a retest or a re-grade publishes a new result and keeps the earlier one readable.

from the publication record
16 November 2026First publishedManaged RAG v1

Act on this result

Nothing filed here edits the run or the grade. A challenge opens a review, and a review can produce a new run or a re-grade — which becomes the current result and leaves this one in the history.

This matches what I see

You run the same kind of test against your own setup and get the same behaviour.

Agree →
This does not match

Yours behaves differently. Tell us what you got, with a screenshot if you have one.

Disagree →
Point out an issue

Something here is wrong — a reference value, a transcription, a grade.

Report an issue →
Request a retest

On a newer build, a larger dataset, or your own setup.

Request a retest →
We have fixed this

Tell us what changed and we schedule a rerun of the failing test case. The old result stays as history.

Vendor notice →
Filed against this evidenceNothing yet. Challenges, counter-evidence and fix notices appear here with their outcome, and stay on the page after they are resolved.
Cite this result
aidemos.com/benchmarks/managed-rag/results/ragflow/document-scoped-retrieval · 1 pass · 0 fail · coverage 1/1 · graded 2026-11-09

The same record is available as structured data through the AI Demos MCP server, with the counts, the coverage and every per-test-case reason carried as fields.

Verify the proof files

These files support this result. Open a file to inspect the original evidence.

Captured file (text) ↗text/plain; charset=utf-8 · 35 KB
Proof 1 · Screenshot ↗image/png · 508 KB
File fingerprints (SHA-256)

A fingerprint identifies the exact file used for this result.

Captured file (text)a810bf680a3307cecb30ef16f31396c7887d769288532f263d30d3976202a1cb
Proof 1 · Screenshot7c065101febd71b22e77d602c26df8d8da27ea55a96b0327d2833c9d52a54271